Wisconsin DOT · highway letting brief

December 8, 2026

47 proposals, mostly small rural bridge replacements and resurfacing, with a handful of large corridor jobs. The biggest by scope are the USH 51 rebuild near McFarland, USH 14 through Darien, and two long asphalt jobs on STH 27 in Rusk County and USH 53 in Trempealeau County. The Southwest region has the most proposals (16).

Proposals
47
Counties
33
Bid items
4,592
  • Bridge20
  • Resurfacing12
  • Reconstruction8
  • Safety and traffic5
  • Grading1
  • Culvert and drainage1

Where the work is

Shade is the number of proposals in each county. Pick a business type to see only the proposals with work for it. Click a county to list its proposals below.

None1234+47 proposals

Business type · proposals

Every county with a proposal. Pick a business type to narrow the map, the list and the counts.

Who should be looking

Proposals with work for each business type, by WisDOT region (assigned by county). Click a cell to list those proposals.

SouthwestSoutheastNortheastNorth CentralNorthwestAll
Traffic control46
Erosion control41
Ready-mix concrete40
Signing and pavement marking35
Asphalt / HMA35
Hauling23
Precast and pipe23
Rebar and structural steel22
Earthwork22
Guardrail20
Geosynthetics20
Electrical13
Concrete paving and cement11
Landscaping1

Worth a look

Eight proposals that stand out by scope or by the range of trades they need.

049Major

Janesville - Big Foot, IH 43 to CTH K

USH 014 · Village of Darien · Walworth County · Southeast

Reconstructs USH 14 through Darien between IH 43 and CTH K with new concrete pavement, new storm sewer, curb and gutter and sidewalk, plus an asphalt mill and overlay on the south end.

  • Concrete paving and cement
  • Ready-mix concrete
  • Asphalt / HMA
  • Earthwork
  • Hauling
  • Precast and pipe
  • Traffic control
  • Signing and pavement marking
  • Geosynthetics
  • Erosion control
  • Guardrail
  • Electrical

Standout by scope: full urban reconstruction with about 41,000 SY of concrete pavement, 50,000 CY of excavation, 7,600 LF of storm sewer and work for nearly every trade.

048Major

Stoughton - Madison, CTH B/Ab to Tower Road

USH 51 · McFarland area · Dane County · Southwest

Reconstruct USH 51 between CTH B/AB and Tower Road with new concrete pavement, a roundabout at Mahoney Road, culverts, storm sewer, lighting and wildlife crossing culverts.

  • Concrete paving and cement
  • Earthwork
  • Hauling
  • Asphalt / HMA
  • Ready-mix concrete
  • Precast and pipe
  • Rebar and structural steel
  • Guardrail
  • Electrical
  • Traffic control
  • Signing and pavement marking
  • Erosion control
  • Landscaping
  • Geosynthetics

Full reconstruction by scope: about 45,000 SY of concrete pavement, about 73,000 CY of excavation, a lighted roundabout, culverts and storm sewer, with work for nearly every trade.

044Large

Cornell - Ladysmith, Chippewa/Rusk Co Ln to USH 8

STH 27 · Ladysmith · Rusk County · Northwest

Mill and overlay of STH 27 with about 56,000 tons of HMA, plus culvert replacements, bridge and box culvert repairs, a traffic signal replacement, and guardrail replacement.

  • Asphalt / HMA
  • Hauling
  • Precast and pipe
  • Ready-mix concrete
  • Rebar and structural steel
  • Guardrail
  • Electrical
  • Traffic control
  • Signing and pavement marking
  • Erosion control

By scope: about 247,000 SY of milling and about 56,000 tons of HMA, with culvert pipe, structure repair, signal, guardrail and marking work in one contract.

014Large

Southwest Region, Bridge Rehabs, Rock River B-53-172 & B-53-104

STH 081 · Beloit · Rock County · Southwest

Rehabilitates two Rock River bridges in Beloit: a full deck replacement with new railing and street lighting on CTH Q, and joint, backwall, approach slab and polymer overlay work on STH 81.

  • Ready-mix concrete
  • Rebar and structural steel
  • Concrete paving and cement
  • Asphalt / HMA
  • Earthwork
  • Hauling
  • Electrical
  • Guardrail
  • Precast and pipe
  • Traffic control
  • Signing and pavement marking
  • Erosion control
  • Geosynthetics

Two-bridge rehab by scope: a full deck replacement with about 623,000 LB of rebar and 2,600 CY of concrete, an 11,000 SY polymer overlay, plus lighting, painting and staged traffic control over two seasons.

043Large

C Washburn, Bayfield Street, Washington Ave to Superior Ave

STH 013 · Washburn · Bayfield County · Northwest

Full urban reconstruction of Bayfield Street (STH 13) through Washburn: new concrete and HMA pavement, curb and gutter, sidewalk, storm sewer, street lighting, and pavement marking.

  • Concrete paving and cement
  • Ready-mix concrete
  • Asphalt / HMA
  • Hauling
  • Earthwork
  • Precast and pipe
  • Electrical
  • Traffic control
  • Signing and pavement marking
  • Erosion control

Full main-street reconstruction with concrete and HMA paving, large curb, sidewalk, and storm sewer quantities, and street lighting.

040Large

C Arcadia, Main Street, CTH a to 250' W of STH 93

STH 95 · Arcadia · Trempealeau County · Northwest

Mills and repaves Main Street (STH 95) through Arcadia with about 9,400 tons of HMA, and replaces curb and gutter, sidewalk, storm sewer, sanitary sewer and water main along the corridor.

  • Asphalt / HMA
  • Hauling
  • Ready-mix concrete
  • Precast and pipe
  • Traffic control
  • Signing and pavement marking
  • Electrical
  • Erosion control
  • Earthwork

Wide variety of work on one urban corridor: mill and overlay, curb and sidewalk, storm and sanitary sewer, water main, bridge maintenance, lighting and grooved epoxy marking, under a detour with an interim deadline.

038Large

Galesville - Whitehall, Beaver Creek to STH 95 W

USH 53 · Trempealeau County · Northwest

Mill and repave USH 53 from Beaver Creek to STH 95 with about 62,000 tons of HMA, plus guardrail upgrades, bridge deck repair and culvert work.

  • Asphalt / HMA
  • Hauling
  • Guardrail
  • Signing and pavement marking
  • Traffic control
  • Precast and pipe
  • Erosion control
  • Electrical

Large asphalt job by scope, about 62,000 tons HMA, with guardrail, marking, bridge deck repair and culvert work alongside.

018Large

IH 94 East West, Early Grading, Menomonee River to 32nd Street

IH 94 · Milwaukee · Milwaukee County · Southeast

Early grading for the IH 94 East-West rebuild in Milwaukee: clearing, embankment, site garbage disposal, fencing, a short water main and storm sewer, and large topsoil and erosion control work.

  • Earthwork
  • Hauling
  • Erosion control
  • Guardrail
  • Traffic control
  • Precast and pipe

Early grading contract for the IH 94 East-West corridor: about 21,000 CY of embankment, garbage disposal, and large topsoil and erosion control quantities on a year-round schedule.

All proposals

Each line is written from the proposal's schedule of items and its Description of Work. Open a line for key items, trades and timing.

47 of 47
001Janesville - Portage, Br Over Femrite Dr B-13-463Repair the IH 39 bridge over Femrite Drive by replacing a prestressed girder, placing HPC concrete and a polymer overlay, under interstate traffic control.Dane · SouthwestBridgeMedium52 items

Bridge rehabilitation on B-13-463: remove and replace a prestressed girder (61 LF), about 23 CY of HPC masonry, concrete surface repair, polymer overlay, concrete staining and fiber wrap. Work runs under interstate traffic control with temporary precast barrier, drums, arrow boards and message boards, then grooved wet-reflective epoxy marking. IH 39 must reopen to through traffic by May 31, 2027 (interim completion); lane rental fees apply and ramp lane closures are limited to overnight hours. Femrite Drive may be closed for the whole project.

IH 39 · Madison · Dane County · State ID 1007-09-82

Key items

Prestressed girder Type I 36-inchabout 61LF
HPC masonry structuresabout 23CY
Bar steel reinforcement HS coated structuresabout 4,600LB
Concrete stainingabout 750SF
Concrete barrier temporary precast (delivered and installed)about 210LF
Marking line grooved wet ref epoxy 6-inchabout 1,500LF

Who should look

  • Rebar and structural steelPrestressed girder replacement, steel diaphragm and about 4,600 LB of coated bar steel.
  • Ready-mix concreteAbout 23 CY of HPC masonry for the bridge; small volume.
  • Traffic controlDrums, Type III barricades, warning lights, connected arrow boards, PCMS, temporary precast barrier and crash cushion.
  • Signing and pavement markingAbout 1,500 LF of grooved wet-reflective epoxy, about 5,200 LF of temporary paint line, marking removal.

Timing

complete by Jun 30, 2027. Start no later than April 5, 2027. Interim completion May 31, 2027 to reopen IH 39 to through traffic after girder, HPC masonry and parapet work, with daily interim liquidated damages. Lane rental assessment for closures outside allowed hours; ramp lane closures 9:30 PM to 5:30 AM.

002Watertown - Waupun, Center Street to STH 33Mill and overlay of STH 26 with about 5,000 tons of HMA, plus concrete pavement repair, curb ramp and sidewalk replacement, and epoxy pavement marking.Dodge · SouthwestResurfacingMedium97 items

Milling of about 39,000 SY and a new HMA surface course, with the upper 2-inch overlay placed within 96 hours of milling. Concrete pavement repair and replacement, curb and gutter, and curb ramp replacements in the Juneau segment between CTH S (Center Street) and CTH DF. That segment closes to through traffic with a detour (STH 26-CTH A-STH 33) for up to 28 calendar days; the mill and overlay from CTH DF to the north limit stays open to traffic. Includes centerline rumble strips and grooved wet-reflective epoxy lines.

STH 26 · Juneau · Dodge County · State ID 1390-01-76

Key items

Removing asphaltic surface millingabout 39,000SY
HMA Pavement 4 MT 58-28 Sabout 5,000TON
Marking line grooved wet reflective epoxy 6-inchabout 32,000LF
Asphaltic rumble strips, centerlineabout 8,700LF
Concrete sidewalk 5-inchabout 2,300SF
Concrete pavement replacementabout 310SY

Who should look

  • Asphalt / HMAAbout 5,000 tons of HMA pavement, tack coat, driveway and patching surface
  • HaulingAbout 39,000 SY of milling to haul off and about 5,000 tons of HMA to deliver
  • Ready-mix concreteConcrete pavement repair and replacement (about 350 SY), about 600 LF of curb and gutter, about 2,300 SF of sidewalk and curb ramps
  • Signing and pavement markingAbout 32,000 LF of grooved wet-reflective epoxy line plus crosswalk, stop line and curb marking
  • Traffic controlDrums (about 1,400 days), Type III barricades, warning lights, PCMS, and temporary pedestrian devices for the detour

Timing

complete by Jun 11, 2027. Interim completion: STH 26 between CTH S (Center Street) and CTH DF closed with detour for at most 28 calendar days; all work in that segment done before reopening. Upper 2-inch overlay within 96 hours of milling.

003Horicon - Kewaskum, E Br Rock R Bridge B-14-067Replace the concrete deck on the STH 28 bridge over the East Branch Rock River in Mayville, with new approach slabs, concrete pavement and steel girder coating.Dodge · SouthwestBridgeMedium81 items

Remove and replace the bridge deck on B-14-067 (about 400 CY of bridge concrete, about 88,000 LB coated bar steel), new expansion devices and tubular railing. Clean and prime the steel, coat top flanges, paint bearings, and abate asbestos, with waste containment. Replace concrete approach slabs, about 640 SY of concrete pavement, curb and gutter and sidewalk. STH 28 is closed to through traffic with a posted detour set up by an adjacent project; sidewalk closed with no pedestrian detour.

STH 28 · Mayville · Dodge County · State ID 3020-00-89

Key items

Concrete masonry bridgesabout 400CY
Bar steel reinforcement HS coated structuresabout 88,000LB
Concrete pavement 8 1/2-inchabout 640SY
Concrete pavement approach slababout 140SY
Railing tubular type Habout 400LF
Concrete sidewalk 5-inchabout 1,600SF

Who should look

  • Ready-mix concreteAbout 400 CY deck concrete plus curb and gutter and about 1,600 SF sidewalk
  • Rebar and structural steelAbout 88,000 LB coated bar steel and structural steel carbon
  • Concrete paving and cementAbout 640 SY of 8 1/2-inch concrete pavement and approach slabs
  • Traffic controlDrums, Type III barricades, warning lights and PCMS by the day
  • Signing and pavement markingAbout 1,400 LF of epoxy line marking
  • Erosion controlSilt fence, erosion mat, turbidity barriers, inlet protection

Timing

50 working days. 2027 season; conditional start no later than March 15; bird deterrent installed by April 14. No in-stream work March 1 to June 15. STH 28 closed with detour.

004Lowell - Hartford, Level Valley & CTH R Brs B-14-61/62Rehabilitation of two STH 60 bridges with concrete deck overlays, deck repair, concrete slope paving, new approach slabs, and thrie beam guard at the approaches.Dodge · SouthwestBridgeMedium59 items

Work on both decks includes deck preparation, full-depth deck repair, about 87 CY of concrete overlay, epoxy crack sealing, and protective surface treatment. Concrete slope paving under the bridges is removed and replaced, approach slabs and a small amount of HMA are placed, timber railing is replaced, and thrie beam and plate beam guard are installed. STH 60 is closed with a posted detour via STH 26, STH 33, and STH 67; pedestrian access under the bridge is kept on Level Valley Road or CTH R.

STH 060 · Dodge County · State ID 3042-01-60

Key items

Concrete masonry overlay decksabout 87CY
Protective surface treatmentabout 1,200SY
Slope paving concreteabout 650SY
Concrete pavement approach slababout 190SY
Steel plate beam guard Class A and thrie beam structure approachabout 370LF
Marking line epoxy 6-inchabout 1,600LF

Who should look

  • Ready-mix concreteDeck overlay (about 87 CY), slope paving (about 650 SY), deck and surface repair, concrete surface drains.
  • Concrete paving and cementSmall amount: about 190 SY of approach slab and about 140 SY of 8-inch concrete pavement.
  • GuardrailAbout 200 LF plate beam guard, about 160 LF thrie beam structure approach, 3 retrofit blunt ends, timber railing replacement.
  • Asphalt / HMASmall: about 78 tons of HMA pavement.
  • Traffic controlType III barricades, warning lights, PCMS, and detour signing.
  • Signing and pavement markingAbout 1,600 LF of 6-inch epoxy line.
  • Erosion controlSilt fence, erosion mat, seeding, and topsoil on a small footprint.

Timing

complete by Aug 20, 2027. Do not start work needing road or sidewalk closures before June 14. STH 60 closed with a posted detour (STH 26, STH 33, STH 67). Bird deterrents required on both bridges before nesting season.

006C Sun Prairie, O'Keeffe Avenue, Mccoy Road IntersectionInstalls a new traffic signal at O'Keeffe Avenue and McCoy Road in Sun Prairie and extends the curbed median, with curb ramps, sidewalk and minor storm sewer work.Dane · SouthwestSafety and trafficMedium95 items

New signal with monotube arms up to 45 FT, 12 signal faces with backplates, pedestrian signals and push buttons, a NEMA TS2 cabinet and controller, emergency vehicle preemption, vehicle detection, a PTZ camera and LED luminaires. Civil work extends the O'Keeffe Avenue median with curb and gutter, adds sidewalk and curb ramps, and replaces one inlet. Built in two stages: median, storm sewer and median signal work first, then the signal and curb ramps; one lane stays open each way.

Local street · Sun Prairie · Dane County · State ID 3996-00-12

Key items

Monotube arms 40-FT and 45-FT special2EACH
Traffic signal face 3S 12-inch12EACH
Cable traffic signal 12-14 AWGabout 1,100LF
Conduit special 3-inchabout 400LF
NEMA TS2 type 1 traffic signal control cabinet and controller1EACH
Concrete sidewalk 5-inchabout 700SF

Who should look

  • ElectricalFull new signal: poles, monotube arms, 12 signal faces, cabinet, EVP, detection, PTZ camera, about 3,500 LF cable and wire, conduit, LED luminaires
  • Traffic controlDrums about 1,700 days, Type III barricades, warning lights
  • Ready-mix concreteCurb and gutter, sidewalk about 750 SF, median nose, signal concrete bases
  • Signing and pavement markingType II signs about 80 SF, epoxy stop lines and block crosswalks

Timing

35 working days. 2027 season, two stages; at least one lane open each direction.

007T Forest - T Wellington (CTH Z), Billings Creek Bridge B-41-0332Replacement of the CTH Z bridge over Billings Creek in Monroe County, with a new concrete bridge on steel piling, approach slabs, guardrail, and asphalt approaches.Monroe · SouthwestBridgeMedium68 items

The contract removes old structure P-41-0134 and builds new bridge B-41-0332: about 250 CY of bridge concrete plus a seal pour, about 36,000 LB of bar steel, about 610 LF of steel HP piling with pre-boring into rock, and tubular steel railing. Approach work includes concrete approach slabs, about 200 tons of asphaltic surface, MGS guardrail, and haul and disposal of about 350 tons of creosote-contaminated soil. CTH Z is closed for the duration with no posted detour. No instream work in Billings Creek from September 15 to May 1.

CTH Z · Towns of Forest and Wellington · Monroe County · State ID 5165-00-73

Key items

Concrete masonry bridgesabout 250CY
Bar steel reinforcement HS and HS coated structuresabout 36,000LB
Piling steel HP 10-inch x 42 lbabout 610LF
Excavation, hauling, and disposal of creosote contaminated soilabout 350TON
Asphaltic surfaceabout 200TON
Silt fenceabout 2,100LF

Who should look

  • Ready-mix concreteAbout 250 CY of bridge concrete plus about 38 CY of seal concrete.
  • Rebar and structural steelAbout 36,000 LB of bar steel, about 610 LF of steel HP piling, and tubular steel railing.
  • Concrete paving and cementSmall concrete approach slab and 12-inch pavement quantities (about 75 SY combined).
  • Asphalt / HMAAbout 200 tons of asphaltic surface.
  • EarthworkAbout 630 CY of common excavation, cofferdams, and creosote-contaminated soil removal.
  • HaulingHaul and disposal of about 350 tons of creosote-contaminated soil.
  • GuardrailMGS guardrail, thrie beam transition, terminal, and guardrail removal.
  • Traffic controlType III barricades, warning lights, drums, and PCMS for the road closure.
  • Erosion controlAbout 2,100 LF of silt fence, erosion mat, turbidity barrier, salvaged topsoil, and seeding.

Timing

60 working days. 2027 construction season. CTH Z closed for the duration, no posted detour. No instream disturbance September 15 to May 1.

008Boscobel - Gotham, North Junction USH 61 to CTH WMill and repave STH 60 from USH 61 to CTH W with about 16,000 tons of HMA, new MGS guardrail and steel bridge recoating.Crawford / Richland · SouthwestResurfacingMedium58 items

Mill about 71,000 SY of asphalt and place about 16,000 tons of HMA, then add rumble strips and grooved wet-reflective epoxy marking. Replace beam guard with about 3,900 LF of MGS guardrail and 16 EAT terminals, and paint about 3,000 LF of beam guard. Clean and prime the steel on bridge B-12-23 with containment, strap bridge B-52-31, and install about 3,600 LF of turtle exclusion fence. STH 60 stays open with daytime flagging; the lower lift must be placed within 96 hours of removal.

STH 60 · Crawford / Richland County · State ID 5190-04-72

Key items

HMA pavement 4 LT 58-28 Sabout 16,000TON
Removing asphaltic surface millingabout 71,000SY
Marking line grooved wet ref epoxy 6-inchabout 62,000LF
MGS guardrail 3 Kabout 3,900LF
Asphaltic rumble strips, centerlineabout 18,000LF
Installing and maintaining climbing turtle exclusion fenceabout 3,600LF

Who should look

  • Asphalt / HMAAbout 16,000 tons HMA, tack coat and rumble strips
  • HaulingAbout 16,000 tons of HMA and about 71,000 SY of milling
  • GuardrailAbout 3,900 LF MGS guardrail, 16 EAT terminals, beam guard painting, turtle exclusion fence
  • Signing and pavement markingAbout 62,000 LF grooved epoxy marking
  • Traffic controlPCMS, signs by the day and about 42,000 LF temporary marking
  • Erosion controlAbout 3,200 LF silt fence

Timing

45 working days. 2027 season. Open to traffic with daytime flagging, two lanes restored each night. Lower HMA lift within 96 hours of removal.

009Sauk City - Arlington, Riddle Road to Clark StreetRepaves STH 60 through Lodi from Riddle Road to Clark Street with new HMA pavement, replacing curb and gutter, sidewalk, curb ramps and driveways, plus a modular block wall and new epoxy pavement marking.Columbia · SouthwestResurfacingMedium92 items

Urban street work on STH 60 in Lodi: about 4,900 tons of HMA pavement, about 1,600 LF of concrete curb and gutter, about 7,000 SF of sidewalk, curb ramps, driveways, concrete steps and a modular block landscape wall. STH 60 is closed with a signed detour, keeping one lane through the work zone and access to businesses and homes; pedestrian access is kept with temporary pedestrian surfaces, ramps and barricades. Work cannot start until the City of Lodi water main and sanitary sewer project is done.

STH 60 · Lodi · Columbia County · State ID 5270-01-70

Key items

HMA pavement 4 MT 58-28 Habout 4,900TON
Concrete sidewalk 5-inchabout 6,500SF
Concrete curb & gutter 30-inch Type Dabout 840LF
Marking line grooved wet ref epoxy 6-inchabout 13,000LF
Wall modular block gravity landscapeabout 1,100SF
Temporary pedestrian barricadeabout 4,000LF

Who should look

  • Asphalt / HMAAbout 4,900 TON of HMA pavement plus tack coat
  • HaulingHMA tonnage and about 990 CY of common excavation
  • Ready-mix concreteCurb and gutter (about 1,600 LF across items), sidewalk, driveways, steps, pavement repair
  • Traffic controlDrums, Type III barricades, warning lights and signs by the day; temporary pedestrian devices and audible message devices
  • Signing and pavement markingAbout 13,000 LF grooved epoxy line, crosswalk and stop line epoxy, new signs and posts
  • Erosion controlSod lawn (about 570 SY), inlet protection, silt fence

Timing

65 working days. Notice to proceed within 7 calendar days after the City of Lodi water main and sanitary sewer project is complete. STH 60 closed with signed detour. Sidewalk closures max 5 calendar days.

010STH 81 - CTH C (CTH M), Braezels Branch Bridge B-23-0183Replaces the existing CTH M structure over Braezels Branch with a new concrete bridge (B-23-0183) on steel piling, with approach paving and guardrail.Green · SouthwestBridgeMedium67 items

Structure replacement on CTH M: remove the existing structure and build bridge B-23-0183 with about 210 CY of concrete masonry, about 27,000 LB of bar steel and steel HP 10-inch piling. Approach work includes asphalt surface, MGS guardrail, thrie beam transitions and terminals, and pipe underdrain. CTH M is closed during construction with no signed detour; access kept for nearby homes. No in-stream work March 15 to June 15.

CTH M · Green County · State ID 5646-00-77

Key items

Concrete masonry bridgesabout 210CY
Bar steel reinforcement HS coated structuresabout 22,000LB
Bar steel reinforcement HS structuresabout 5,500LB
Piling steel HP 10-inch x 42 lbabout 490LF
Asphaltic surfaceabout 240TON
MGS thrie beam transitionabout 150LF

Who should look

  • Ready-mix concreteAbout 210 CY of bridge concrete masonry
  • Rebar and structural steelAbout 27,000 LB of bar steel and about 490 LF of steel HP piling
  • GuardrailMGS guardrail, thrie beam transitions and 4 terminals
  • Traffic controlType III barricades, warning lights and signs by the day for the closure
  • Erosion controlErosion mat (about 1,500 SY), silt fence (about 710 LF), seeding
  • GeosyntheticsGeotextile Types HR, DF and R (about 580 SY total)

Timing

55 working days. 2027 construction season. CTH M closed, no signed detour. No in-stream work March 15 to June 15.

011CTH W - V North Freedom, Baraboo River Bridge B-56-0255Replacement of the CTH PF bridge over the Baraboo River with a new concrete bridge on steel H-piles, plus approach grading, curb and gutter, sidewalk, storm sewer, and asphalt surface.Sauk · SouthwestBridgeMedium102 items

The existing bridge B-56-0672 is removed and new bridge B-56-0255 is built inside cofferdams on steel HP 10-inch piling, with about 800 CY of bridge concrete and about 120,000 LB of reinforcing bar, most of it coated. Approach work includes concrete curb and gutter, about 2,000 SF of 4-inch sidewalk plus 6-inch sidewalk, a short run of storm sewer with inlets and a manhole, and about 180 tons of asphaltic surface. CTH PF is closed to through traffic with no posted detour, and no in-stream work is allowed March 1 to June 15.

CTH PF · North Freedom · Sauk County · State ID 5659-00-74

Key items

Concrete masonry bridgesabout 800CY
Bar steel reinforcement HS coated structuresabout 110,000LB
Piling steel HP 10-inch x 42 lbabout 1,600LF
Concrete sidewalk 4-inchabout 2,000SF
Concrete curb and gutter 30-inch Type Dabout 300LF
Asphaltic surfaceabout 180TON

Who should look

  • Ready-mix concreteAbout 800 CY of bridge concrete, plus curb and gutter, sidewalk, and driveway.
  • Rebar and structural steelAbout 110,000 LB coated and about 13,000 LB uncoated reinforcing bar; about 1,600 LF of steel HP piling with pile points.
  • Precast and pipeAbout 87 LF reinforced concrete storm sewer, 18-inch culvert pipe with endwalls, inlets, catch basin, and manhole.
  • Asphalt / HMASmall: about 180 tons of asphaltic surface.
  • Erosion controlSilt fence, urban erosion mat, turbidity barriers, inlet protection, seeding.
  • Traffic controlDrums, Type III barricades, warning lights, and fixed message signs for the road closure.
  • Signing and pavement markingAbout 1,600 LF of 4-inch epoxy line and epoxy curb marking.
  • GeosyntheticsAbout 930 SY of Type HR geotextile and DF geotextile.

Timing

75 working days. Work in the 2027 season; notice to proceed so work starts no later than June 16, 2027. No in-stream disturbance March 1 to June 15. No tree clearing April 15 to October 31. CTH PF closed to through traffic, no detour.

012T Mt. Ida, Green River Road, Br Big Green River Bridge B-22-0310Replace the Green River Road bridge over a branch of the Big Green River with a new concrete bridge B-22-0310 on steel piles.Grant · SouthwestBridgeMedium52 items

Remove existing structure P-22-0154 and build new bridge B-22-0310 with about 180 CY of bridge concrete, coated bar steel, steel HP piling and tubular railing. Approach work includes a small amount of asphalt surface, grading, erosion control and new signs. Green River Road is closed for the duration with no posted detour. No in-stream work from September 15 to May 15 for fish spawning.

LOC STR · Town of Mt. Ida · Grant County · State ID 5757-00-73

Key items

Concrete masonry bridgesabout 180CY
Bar steel reinforcement HS coated structuresabout 24,000LB
Piling steel HP 10-inch x 42 lbabout 200LF
Railing tubular type Mabout 160LF
Excavation commonabout 90CY
Asphaltic surfaceabout 50TON

Who should look

  • Ready-mix concreteAbout 180 CY of bridge concrete for B-22-0310
  • Rebar and structural steelAbout 28,000 LB of bar steel plus steel HP piling
  • Traffic controlType III barricades, warning lights and signs by the day for the road closure
  • Erosion controlSilt fence, erosion mat, turbidity barriers and seeding
  • GeosyntheticsAbout 230 SY of geotextile type HR plus type DF
  • Asphalt / HMASmall asphaltic surface quantity on the approaches, about 50 tons

Timing

40 working days. Construction in the 2027 season. Road closed, no posted detour. No in-stream disturbance September 15 to May 15.

013STH 23 - Lone Rock, STH 23 to STH 133Milling and HMA repaving of STH 130 between STH 23 and STH 133 near Lone Rock, with rock and common excavation, culvert replacement, new guardrail, and grooved epoxy marking.Iowa · SouthwestResurfacingLarge118 items

Two projects mill about 149,000 SY of existing pavement and place about 27,000 tons of HMA in two layers, with centerline rumble strips. Earthwork includes about 33,000 CY of rock excavation (blasting allowed only May 15 to August 15) and about 20,000 CY of common excavation. Culverts are replaced with concrete elliptical and non-metal pipe, and about 7,600 LF of MGS guardrail replaces about 8,500 LF of old rail. STH 130 is closed to through traffic with a detour via STH 23, USH 14, and STH 133.

STH 130 · Lone Rock · Iowa County · State ID 5770-02-70, 5770-02-72

Key items

Removing asphaltic surface millingabout 149,000SY
HMA pavement 3 LT and 4 LT 58-28 Sabout 27,000TON
Excavation rockabout 33,000CY
Excavation commonabout 20,000CY
MGS guardrail 3 and 3 Kabout 7,600LF
Marking line grooved wet reflective epoxy 6-inchabout 220,000LF

Who should look

  • Asphalt / HMAAbout 27,000 tons of HMA, about 13,000 gallons of tack coat, milling, and rumble strips.
  • EarthworkAbout 33,000 CY of rock excavation with blasting and about 20,000 CY of common excavation, plus clearing and grubbing.
  • HaulingLarge excavation volumes and about 27,000 tons of HMA to place.
  • Precast and pipeReinforced concrete horizontal elliptical culvert pipe, Class III-A non-metal pipe 24 to 36 inch, apron endwalls, and pipe grates.
  • GuardrailAbout 7,600 LF of MGS guardrail, short radius rail, terminals, mow strip, and beam guard painting.
  • Signing and pavement markingAbout 220,000 LF of grooved wet reflective epoxy line, stop lines, new and relocated signs.
  • Erosion controlAbout 20,000 SY of Class III erosion mat, about 24,000 SY of salvaged topsoil, silt fence, ditch checks, and seeding including a pollinator mix.
  • Traffic controlBarricades, drums, warning lights, PCMS, and about 111,000 LF of temporary epoxy marking for the detour and staging.

Timing

80 working days. 2027 construction season. STH 130 closed to through traffic; detour via STH 23, USH 14, STH 133. Lower HMA layer within 7 days of milling. Guardrail replaced within 72 hours of removal. No blasting August 16 to May 14. Tree clearing only outside April 15 to October 31.

014Southwest Region, Bridge Rehabs, Rock River B-53-172 & B-53-104Rehabilitates two Rock River bridges in Beloit: a full deck replacement with new railing and street lighting on CTH Q, and joint, backwall, approach slab and polymer overlay work on STH 81.Rock · SouthwestBridgeLarge171 itemsWorth a look

On CTH Q (B-53-104) the work replaces the deck, joints, bearings and pedestrian railing, spot paints girders, replaces approach slabs, adds HMA paving, guardrail and street lighting. On STH 81 (B-53-172) the work replaces joints and abutment backwalls, repairs concrete surfaces, replaces approach slabs and places a polymer overlay. CTH Q is closed with a detour and must reopen by November 15, 2027; STH 81 stays open in stages with one lane each way. Includes asbestos abatement, containment for coating work, and work inside the Beloit Dam FERC boundary.

STH 081 · Beloit · Rock County · State ID 5989-03-84

Key items

Bar steel reinforcement HS coated structuresabout 623,000LB
Concrete masonry bridgesabout 2,600CY
Polymer overlayabout 11,300SY
Railing steel pedestrian Type C2about 1,000LF
HMA pavement 4 MT 58-28 Sabout 980TON
Expansion devices (standard and modular)about 350LF

Who should look

  • Ready-mix concreteAbout 2,600 CY of bridge concrete, plus curb and gutter (about 1,300 LF) and sidewalk.
  • Rebar and structural steelAbout 623,000 LB of coated bar steel, bar couplers, expansion bearings, pedestrian railing.
  • Concrete paving and cementConcrete approach slabs (about 320 SY) and 10-inch concrete pavement (about 110 SY).
  • Asphalt / HMAAbout 980 tons of HMA pavement plus asphaltic surface on the CTH Q approaches.
  • EarthworkAbout 3,800 CY of common excavation plus structure excavation and removals.
  • HaulingAbout 3,800 CY of excavation and about 1,000 tons of HMA to move.
  • ElectricalStreet lighting on CTH Q: 8 aluminum poles and LED luminaires, about 5,100 LF of conduit, lighting wire.
  • GuardrailMGS guardrail, thrie beam transitions and EAT terminals.
  • Precast and pipe18-inch concrete storm sewer and endwall, inlets, underdrain, and about 1,400 LF of temporary precast barrier.
  • Traffic controlDrums, Type III barricades, connected arrow boards, PCMS, cones, temporary RRFBs for staged lanes and detour.
  • Signing and pavement markingAbout 12,900 LF of epoxy line marking plus signs.
  • Erosion controlSilt fence, urban erosion mat, inlet protection, seeding.
  • GeosyntheticsGeotextile Type DF, about 440 SY.

Timing

complete by Aug 18, 2028. Interim completion: CTH Q reopened to traffic by November 15, 2027 (interim liquidated damages). CTH Q polymer overlay and final marking in 2028 with a closure of at most 14 days after June 18, 2028. STH 81 staged in six stages, one lane each direction open. No instream work March 15 to June 15.

015C Madison, South Whitney Way, Odana Road IntersectionRebuilds the traffic signals at South Whitney Way and Odana Road in Madison, with new signal poles, heads, cabinet and fiber, plus new curb ramps, curb and gutter, sidewalk and epoxy pavement marking.Dane · SouthwestSafety and trafficMedium147 items

Replaces the existing traffic signal with new poles and monotube and trombone arms, 29 vehicle signal heads with retroreflective backplates, 16 pedestrian countdown heads, an accessible pedestrian signal system, a NEMA TS2 cabinet, vehicle detection, preemption and fiber optic interconnect. Civil work covers high-early-strength curb and gutter, sidewalk and curb ramps, inlets and short storm sewer, and a small HMA patch. Built in two stages (corner quadrants, then medians) with both roads open at all times and lane closures limited to off-peak hours.

LOC STR · Madison · Dane County · State ID 5992-07-07

Key items

Traffic signal heads 12-inch (3-, 4- and 5-section)29EACH
Traffic signal heads 16-inch pedestrian with countdown16EACH
Cable traffic signal (5-14 and 12-14 AWG)about 7,800LF
Conduit (rigid nonmetallic and special)about 1,800LF
Concrete sidewalk 5-inch HESabout 3,500SF
Concrete curb and gutter 30-inch HESabout 800LF

Who should look

  • ElectricalFull signal rebuild: signal poles and arms, 45 signal heads, cabinet, detection, preemption, APS, signal cable, conduit, pull boxes, fiber optic, lighting wire.
  • Ready-mix concreteHES curb and gutter (about 800 LF), pedestrian curb, about 3,500 SF of HES sidewalk, signal and light pole concrete bases, median nose.
  • Traffic controlDrums, Type III barricades, connected arrow boards, PCMS, cones, temporary signals and removable tape for staged lane closures.
  • Signing and pavement markingEpoxy line marking (about 3,000 LF), about 1,000 LF of ladder crosswalk, stop lines, arrows, plus sign moves.
  • Asphalt / HMAAbout 70 tons of HMA pavement.
  • Precast and pipeTwo 2x3-ft inlets and short 12-inch concrete storm sewer.

Timing

complete by Sep 3, 2027. Notice to proceed not before June 14, 2027 (end of Madison school year). Two stages: corner quadrants, then medians. Whitney Way and Odana Road open at all times; lane closures by peak/off-peak periods.

016C Portage, Cook Street, Wisconsin River to STH 16Rebuild Cook Street (STH 33) in Portage: remove concrete pavement, excavate, repave with HMA, and replace curb and gutter, sidewalk and curb ramps.Columbia · SouthwestReconstructionMedium68 items

Remove about 2,950 SY of concrete pavement plus curb, gutter and sidewalk, excavate about 9,900 CY, and pave with about 6,200 TON of HMA. New concrete curb and gutter, about 6,900 SF of sidewalk, curb ramps with detectable warning fields, and epoxy pavement marking including crosswalks. STH 33 is closed to through traffic for the length of the project with a signed detour and pedestrian detours. Work cannot begin until the city finishes utility work, expected August 15, 2027.

STH 33 · Portage · Columbia County · State ID 6040-00-76

Key items

HMA pavement 3 MT 58-28 Sabout 4,500TON
HMA pavement 4 MT 58-28 Habout 1,600TON
Excavation commonabout 9,900CY
Removing concrete pavementabout 2,900SY
Concrete curb and gutter 30-inch Type Dabout 1,400LF
Concrete sidewalk 5-inchabout 6,900SF

Who should look

  • Asphalt / HMAAbout 6,200 TON of HMA pavement plus tack coat.
  • EarthworkAbout 9,900 CY of common excavation and pavement removals.
  • HaulingExcavation and removed pavement out, HMA in.
  • Ready-mix concreteAbout 1,400 LF of curb and gutter, about 6,900 SF of sidewalk, curb ramps.
  • Traffic controlDrums, Type III barricades, warning lights, temporary pedestrian barricade and audible message devices.
  • Signing and pavement markingAbout 3,500 LF of epoxy line in several widths, crosswalk and diagonal marking.
  • Erosion controlErosion mat, silt fence, inlet protection; small quantities.

Timing

complete by Oct 15, 2027. Do not start until the city's utility project is complete (expected August 15, 2027). Full closure of STH 33 with signed detour; driveway access closures limited to three calendar days.

017Epoxy Pavement Marking 2027, Location On Stn Per Annual PlanRegion-wide 2027 epoxy pavement marking contract for the Southeast Region: long-line epoxy, crosswalks, stop lines, arrows, words, and parking stalls.Milwaukee / Kenosha / Racine / Walworth / Washington / Waukesha · SoutheastSafety and trafficMedium17 items

The contract is almost entirely epoxy marking, led by about 2,700,000 LF of 6-inch line and about 250,000 LF of 10-inch line, plus crosswalk, stop line, parking stall, and black contrast line. The contractor must supply a computerized striper data logging system and a work zone intrusion detection system. Lane closures are limited to set off-peak and overnight windows, with separate windows for Milwaukee and for Kenosha, Racine, Walworth, Washington, and Waukesha, and marking must be coordinated with the Zoo Interchange, WIS 57, WIS 241, USH 12, and WIS 50 projects.

VAR HWY · Milwaukee / Kenosha / Racine / Walworth / Washington / Waukesha County · State ID 1000-77-27

Key items

Marking line epoxy 6-inchabout 2,700,000LF
Marking line epoxy 10-inchabout 250,000LF
Marking crosswalk epoxy transverseabout 37,000LF
Marking line black epoxy 6-inchabout 37,000LF
Marking stop line epoxy 18-inchabout 15,000LF
Marking arrow epoxyabout 1,100EACH

Who should look

  • Signing and pavement markingAll work items are epoxy marking: about 2,700,000 LF of 6-inch line, about 250,000 LF of 10-inch line, crosswalks, stop lines, about 1,100 arrows, and about 450 words.

Timing

complete by Oct 31, 2027. Lane closures only in set overnight and midday windows; no work over Memorial Day, Independence Day, and Labor Day weekends.

018IH 94 East West, Early Grading, Menomonee River to 32nd StreetEarly grading for the IH 94 East-West rebuild in Milwaukee: clearing, embankment, site garbage disposal, fencing, a short water main and storm sewer, and large topsoil and erosion control work.Milwaukee · SoutheastGradingLarge65 itemsWorth a look

Clear and grub 44 stations, build about 21,000 CY of roadway embankment, excavate about 3,400 CY, and haul and dispose of about 2,400 TON of site garbage. Restoration covers about 49,000 SY each of topsoil and salvaged topsoil and about 35,000 SY of erosion mat. Also chain link and safety fence, MGS guardrail, about 85 LF of 12-inch ductile iron water main, four MMSD manhole reconstructions, and vibration monitoring of ATC structures. All IH 94 lanes and ramps stay open; one eastbound outside lane edge stays closed. Year-round contract with no winter suspension and possible multiple mobilizations.

IH 94 · Milwaukee · Milwaukee County · State ID 1060-27-76

Key items

Roadway embankment (SPV)about 21,000CY
Topsoil and salvaged topsoil (each)about 49,000SY
Erosion mat Class I and Class II Type Babout 35,000SY
Excavation commonabout 3,400CY
Excavation, hauling and disposal of site garbageabout 2,400TON
Fence safety and fence chain link 6-FTabout 3,900LF

Who should look

  • EarthworkAbout 21,000 CY of embankment, about 3,400 CY of excavation, clearing and grubbing 44 stations.
  • HaulingEmbankment fill and about 2,400 TON of site garbage to haul and dispose.
  • Erosion controlAbout 35,000 SY of erosion mat, about 13,800 SY of mulch, silt fence, seeding and topsoil restoration.
  • GuardrailAbout 1,400 LF of 6-ft chain link fence, about 2,500 LF of safety fence, 315 LF of MGS guardrail.
  • Traffic controlDrums, Type III barricades, connected arrow boards and work zone end markers.
  • Precast and pipeStorm sewer pipe, manhole, apron endwall and MMSD manhole reconstruction; small quantities.

Timing

complete by Jun 18, 2027. Expedited, year-round schedule with no winter suspension; multiple mobilizations possible. IH 94 lanes and ramps stay open. Railroad flagger needs 40 working days notice.

020V Lisbon, Redford Blvd, Intersection With Lisbon RdRebuilds the CTH F (Redford Blvd) and CTH K (Lisbon Rd) intersection in the Village of Lisbon with new concrete and HMA pavement, curb and gutter, storm sewer, and a full replacement of the traffic signals and lighting.Waukesha · SoutheastReconstructionLarge148 items

Intersection rebuild with about 3,700 SY of 10-inch concrete pavement, about 1,700 tons of HMA, about 1,900 LF of curb and gutter, storm sewer, inlets and culvert pipe. The existing signals are removed and replaced with new poles, monotube arms, signal faces, cabinet and controller, video detection, emergency vehicle preemption and LED luminaires. Work runs in five traffic stages, with two 10-calendar-day lane closures on CTH F carrying interim liquidated damages and a lane rental fee outside allowed closure hours.

CTH F · Lisbon · Waukesha County · State ID 2450-06-71

Key items

Concrete pavement 10-inchabout 3,700SY
HMA pavement 3 HT 58-28 Habout 1,300TON
Excavation commonabout 5,500CY
Concrete curb & gutter 4-inch sloped 36-inch Type Aabout 1,000LF
Conduit special 3-inchabout 1,000LF
Monotube arms (40, 45 and 55 FT)about 4EACH

Who should look

  • Concrete paving and cementAbout 3,700 SY of 10-inch concrete pavement with tie and dowel bars
  • Ready-mix concreteAbout 1,900 LF of curb and gutter, sidewalk, median nose, concrete signal and cabinet bases
  • Asphalt / HMAAbout 1,700 TON of HMA pavement plus temporary asphalt
  • EarthworkAbout 5,500 CY of common excavation
  • HaulingExcavation, pavement removal and HMA tonnage
  • ElectricalNew traffic signals: poles, monotube arms, signal faces, cabinet and controller, video detection, EVP, cable, conduit, LED luminaires
  • Precast and pipeReinforced concrete storm sewer, inlets, corrugated steel culvert pipe and endwalls
  • Traffic controlDrums, cones, barricades, connected arrow boards, PCMS, temporary marking
  • Signing and pavement markingAbout 12,000 LF epoxy line, arrows, words, sign replacement (about 100 signs removed)
  • Erosion controlTopsoil and erosion mat (about 6,100 SY each), silt fence, seeding

Timing

complete by Oct 31, 2027. Five traffic stages. Interim completion: Stage 2 and Stage 4 CTH F lane pavement replacement, 10 calendar days each. Lane rental fee for closures outside allowed hours.

021C Mequon/T Grafton, Pioneer Rd, Intersection Port Washington RdRebuilds the CTH C and CTH W intersection in Mequon with new traffic signals, concrete pavement widening, a right-turn lane and rebuilt median islands.Ozaukee · SoutheastSafety and trafficMedium146 items

Replaces the existing signals with new poles, monotube arms up to 55 FT, 20 signal faces, a new controller and cabinet, and video detection, using a portable temporary signal system during construction. Civil work includes about 950 SY of 9-inch concrete pavement, curb and gutter, sidewalk, corrugated median, storm sewer with manholes, and epoxy marking. Built in three stages with lane shifts and temporary signals; no detour.

CTH C · Mequon / Town of Grafton · Ozaukee County · State ID 2695-05-72

Key items

Concrete pavement 9-inchabout 890SY
Cable traffic signal 12-14 AWGabout 1,600LF
Monotube arms 45 to 55 FT4EACH
Traffic signal faces 3S and 4S 12-inch20EACH
Excavation commonabout 950CY
Marking line epoxy 6-inchabout 3,100LF

Who should look

  • ElectricalNew signals: 7 poles, monotube arms, 20 signal faces, controller and cabinet, video detection, EVP, about 5,000 LF cable and wire, about 1,100 LF conduit, LED luminaires
  • Concrete paving and cementConcrete pavement 9-inch about 890 SY plus HES, tie and dowel bars
  • Ready-mix concreteCurb and gutter about 800 LF, sidewalk, corrugated median, signal bases
  • Traffic controlDrums about 3,800 days, barricades, PCMS, temporary marking, portable temporary signals
  • Signing and pavement markingEpoxy lines about 5,000 LF, arrows, chevrons, water-blast marking removal, Type II signs
  • EarthworkCommon excavation about 950 CY
  • Erosion controlErosion mat about 900 SY, silt fence, inlet protection
  • Precast and pipeRCP storm sewer 15 to 24 inch, about 130 LF, with manholes and inlets

Timing

complete by Sep 30, 2027. Start no earlier than July 6, 2027. Three stages with lane shifts under temporary signals.

022C Racine, Lathrop Ave, Republic Ave to Washington AveConcrete reconstruction of Lathrop Avenue in Racine with new curb and gutter, sidewalk, driveways, storm sewer inlets, a rebuilt traffic signal at 16th Street, signing, and epoxy marking.Racine · SoutheastReconstructionLarge155 items

About 20,000 SY of concrete pavement is removed and replaced with about 15,000 SY of 8-inch concrete pavement, along with about 7,600 LF of curb and gutter, about 16,000 SF of 5-inch sidewalk, about 1,300 SY of concrete driveways, and about 1,200 LF of storm sewer with about 35 inlets. The signal at Lathrop Avenue and 16th Street is rebuilt with new poles, monotube arms, signal faces, controller, detection, and fiber optic connections. Work is done in two stages, one side at a time, with northbound traffic detoured and one southbound lane kept open.

LOC STR · Racine · Racine County · State ID 2703-07-72

Key items

Concrete pavement 8-inchabout 15,000SY
Excavation commonabout 15,000CY
Concrete curb and gutter 30-inch Type Aabout 7,600LF
Concrete sidewalk 5-inchabout 16,000SF
Storm sewer pipe reinforced concrete Class IV 12- and 15-inchabout 1,200LF
Traffic signal faces and pedestrian signal faces28EACH

Who should look

  • Concrete paving and cementAbout 15,000 SY of 8-inch concrete pavement with tie bars and dowel bars.
  • Ready-mix concreteAbout 7,600 LF curb and gutter, about 16,000 SF sidewalk, about 1,300 SY driveways, concrete collars and signal foundations.
  • HaulingAbout 20,000 SY of concrete pavement removal and about 15,000 CY of excavation.
  • EarthworkAbout 15,000 CY common excavation.
  • Precast and pipeAbout 1,200 LF reinforced concrete storm sewer, about 35 inlets, manhole reconstruction.
  • ElectricalTraffic signal rebuild at 16th Street: poles, monotube arms, 20 signal faces, 8 pedestrian faces, controller and cabinet, detection, fiber optic splicing.
  • Traffic controlDrums, cones, Type III barricades, connected arrow boards, PCMS, removable tape for two-stage traffic shifts.
  • Signing and pavement markingAbout 18,000 LF 4-inch epoxy line, crosswalks, arrows, symbols, about 290 SF of new signs on steel posts.
  • Erosion controlAbout 3,600 SY sod, topsoil, inlet protection at about 130 locations.

Timing

complete by Sep 10, 2027. Two stages: southbound side first, then northbound, with northbound Lathrop Ave detoured in both stages. Side streets (Victory Ave, 16th St, Wright Ave) built half at a time. Utility relocations precede and overlap construction.

024V Somers, 12th St, Intersection With 22nd Ave (CTH Y)Traffic signal replacement at the CTH E (12th St) and CTH Y (22nd Ave) intersection in Somers, with new signal poles and mast arms, lighting, curb ramps, and pavement marking.Kenosha · SoutheastSafety and trafficMedium90 items

The contract removes and replaces the full traffic signal: new monotube arms (35, 40, and 45 ft), signal standards, 20 vehicle signal faces, pedestrian signals and push buttons, cabinet and controller, detection, emergency vehicle preemption, and about 1,200 LF of new conduit with steel pull boxes. Lighting adds LED luminaires on new poles and arms. Curb ramps, sidewalk, and curb and gutter are rebuilt at the corners, with a small asphalt patch. Each approach is reduced to one through lane and one turn lane during work, with temporary signals and pedestrian accommodations.

CTH E · Village of Somers · Kenosha County · State ID 3766-02-71

Key items

Cable traffic signal 12-14 AWGabout 1,800LF
Conduit special 3-inchabout 750LF
Conduit rigid nonmetallic schedule 40 3-inchabout 520LF
Traffic signal faces 3S and 4S 12-inch20EACH
Monotube arms 35, 40, and 45 ft special3EACH
Traffic control drumsabout 8,900DAY

Who should look

  • ElectricalFull signal replacement: monotube arms, standards, signal faces, cable, conduit, pull boxes, cabinet and controller, detection, preemption, temporary signals, and LED luminaires.
  • Ready-mix concreteConcrete sidewalk (about 600 SF), curb and gutter, curb ramps, and signal and pole bases.
  • Traffic controlAbout 8,900 drum-days, Type III barricades, warning lights, PCMS, and temporary pedestrian ramps and barricades.
  • Signing and pavement markingEpoxy stop lines and crosswalk marking, marking removal, and new and relocated Type II signs.

Timing

25 working days. 2027 construction season. Outside lane closed on each intersection leg; one through and one turn lane kept per approach. Business, residential, and pedestrian access maintained. Coordinate with adjacent concurrent projects.

025T Darien, Lawson School Road, Creek Road to STH 11Reconstruct and widen Lawson School Road from Creek Road to STH 11 with new HMA pavement, curb and gutter, storm sewer, culverts and sidewalk.Walworth · SoutheastReconstructionLarge104 items

Remove and replace the pavement and widen the road, with about 10,000 CY of excavation, geogrid, and about 3,700 tons of HMA. Adds about 2,600 LF of curb and gutter, curb ramps and sidewalk, reinforced concrete storm sewer with manholes and inlets, steel culvert pipe, ditching and new signs and epoxy marking. City of Delavan sewer and water items are adjusted. The road is closed for the duration with no signed detour; local access is kept open.

LOC STR · Town of Darien · Walworth County · State ID 3837-00-71

Key items

Excavation commonabout 10,000CY
HMA pavement 3 LT 58-28 Sabout 2,100TON
HMA pavement 4 LT 58-28 Sabout 1,600TON
Geogrid type SRabout 18,000SY
Concrete curb and gutter 30-inch type Dabout 2,600LF
Storm sewer pipe reinforced concrete class IV 12-inch and 15-inchabout 540LF

Who should look

  • Asphalt / HMAAbout 3,700 tons of HMA pavement plus tack coat
  • HaulingAbout 10,000 CY of excavation and about 3,700 tons of HMA
  • EarthworkAbout 10,000 CY of common excavation, clearing and grubbing
  • Ready-mix concreteAbout 2,600 LF of curb and gutter, sidewalk and curb ramps
  • Precast and pipeRCP storm sewer, manholes, inlets and corrugated steel culvert pipe with endwalls
  • GeosyntheticsAbout 18,000 SY of geogrid type SR
  • Erosion controlAbout 9,500 SY salvaged topsoil, about 4,500 SY erosion mat, seeding
  • Traffic controlDrums, Type III barricades, PCMS and temporary pedestrian devices
  • Signing and pavement markingAbout 15,000 LF epoxy line marking and new signs on tubular steel posts

Timing

complete by Aug 27, 2027. Completion date August 27, 2027. Road closed for the duration, no signed detour.

026T Linn, Zenda Rd, CTH B to Linton RdPulverize and relay of Zenda Road with about 7,500 tons of new HMA, culvert replacements, new storm sewer and curb, and drainage improvements.Walworth · SoutheastResurfacingMedium83 items

Pulverizing and reshaping the existing asphalt (about 25,000 SY) and paving about 7,500 tons of HMA. Replacing small culverts with corrugated polyethylene pipe and apron endwalls, new reinforced concrete storm sewer with a manhole, and a short run of curb and gutter. Includes about 2,900 CY of common excavation, geogrid, new signs, and epoxy centerline. Zenda Road closes to through traffic with a signed detour for the whole project, and work cannot start before June 7, 2027.

LOC STR · Town of Linn · Walworth County · State ID 3846-02-71

Key items

Pulverize and relayabout 25,000SY
HMA Pavement 3 LT 58-28 Sabout 4,400TON
HMA Pavement 4 LT 58-28 Sabout 3,100TON
Excavation commonabout 2,900CY
Culvert pipe corrugated polyethylene 15-inch and 18-inchabout 680LF
Geogrid Type SRabout 3,500SY

Who should look

  • Asphalt / HMAAbout 7,500 tons of HMA pavement in two mixes
  • HaulingAbout 7,500 tons of HMA and about 2,900 CY of common excavation
  • EarthworkAbout 2,900 CY of common excavation, clearing and grubbing, reshaping
  • Precast and pipeAbout 680 LF of polyethylene culvert pipe, about 210 LF of reinforced concrete storm sewer (round and elliptical), 30 apron endwalls, a 5-FT manhole
  • Erosion controlAbout 20,000 SY of salvaged topsoil, about 11,000 SY of mulch, about 8,500 SY of erosion mat, silt fence and seeding
  • Traffic controlDrums (about 3,500 days), Type III barricades (about 1,000 days), warning lights, PCMS
  • Signing and pavement markingNew Type II signs on steel posts and about 31,000 LF of epoxy line
  • GeosyntheticsAbout 3,500 SY of geogrid and geotextile

Timing

complete by Aug 27, 2027. No work or traffic impact on Zenda Road before June 7, 2027 (school year). Road closed to through traffic with signed detour for the duration.

027T Wayne, Midland Dr, Over Kohlsville River P66-0054Replaces the Midland Drive crossing of the Kohlsville River with a new concrete bridge on cast-in-place concrete piling, with tubular railing and short asphalt approaches.Washington · SoutheastBridgeMedium62 items

Removes existing structure P-66-0054 and builds new bridge B-66-0202 with about 170 CY of concrete, coated bar steel, CIP concrete piling, a cofferdam and Type M tubular railing. Approach work includes grading, about 65 tons of asphaltic surface and permanent signing. Midland Drive is closed with no signed detour. Construction may not start until after August 15 because of a fish spawning window, and a fisheries consultant is required.

LOC STR · Town of Wayne · Washington County · State ID 4823-05-70

Key items

Concrete masonry bridgesabout 170CY
Bar steel reinforcement HS coated structuresabout 24,000LB
Piling CIP concrete 10 3/4 x 0.365-inchabout 360LF
Railing tubular Type Mabout 140LF
Asphaltic surfaceabout 65TON
Erosion mat Class II Type Cabout 310SY

Who should look

  • Ready-mix concreteAbout 170 CY of bridge concrete masonry plus CIP concrete piling fill.
  • Rebar and structural steelAbout 27,000 LB of bar steel, steel pile shells, tubular railing.
  • Asphalt / HMAAbout 65 tons of asphaltic surface.
  • Traffic controlType III barricades, warning lights and PCMS for the road closure.
  • Erosion controlSilt fence, Class II erosion mat, ditch checks, seeding.
  • GeosyntheticsGeotextile Type DF and HR, about 360 SY total.

Timing

45 working days. 2027 construction season; construction may not start on or before August 15. No instream work March 1 to August 15. Midland Drive closed, no signed detour.

028T Barton, Lighthouse Ln, Over Milwaukee River P66-0044Replacement of the Lighthouse Lane bridge over the Milwaukee River in the Town of Barton, with a new concrete bridge on steel piling, new guardrail, culverts, and asphalt approaches.Washington · SoutheastBridgeMedium104 items

The contract removes old structure P-66-0044 and builds new bridge B-66-0156: about 480 CY of bridge concrete, about 78,000 LB of bar steel, and about 420 LF of steel HP piling with pre-boring into rock, plus cofferdams and a temporary causeway. Approach work includes clearing and grubbing, about 300 tons of asphalt, steel culvert pipe and pipe arch, MGS guardrail and thrie beam transitions, new signs, and epoxy marking. Lighthouse Lane is fully closed during the replacement. No instream work in the Milwaukee River from March 1 to July 20, and a fisheries consultant is required.

LOC STR · Town of Barton · Washington County · State ID 4825-05-71

Key items

Concrete masonry bridgesabout 480CY
Bar steel reinforcement HS and HS coated structuresabout 78,000LB
Piling steel HP 10-inch x 42 lbabout 420LF
Asphaltic surfaceabout 300TON
Culvert pipe temporary 24-inchabout 260LF
Marking line epoxy 6-inchabout 2,300LF

Who should look

  • Ready-mix concreteAbout 480 CY of bridge concrete plus curb and gutter and concrete surface drains.
  • Rebar and structural steelAbout 78,000 LB of bar steel and about 420 LF of steel HP piling.
  • Asphalt / HMAAbout 300 tons of asphaltic surface plus milling and tack coat.
  • Precast and pipeCorrugated steel culvert pipe, steel pipe arch, apron endwalls, temporary 24-inch culvert pipe, and underdrain.
  • GuardrailMGS thrie beam transitions, steel plate beam guard, terminals, a permanent crash cushion, and safety fence.
  • Traffic controlType III barricades, warning lights, drums, PCMS, fixed message signs, and temporary precast barrier.
  • Signing and pavement markingAbout 48 SF of new Type II signs on wood and steel posts, and epoxy line and stop bar marking.
  • Erosion controlSilt fence (standard and heavy duty), erosion mat, turbidity barrier, ditch checks, topsoil, and seeding.
  • GeosyntheticsAbout 500 SY of Type DF and HR geotextile.
  • EarthworkClearing, grubbing, about 470 CY of common excavation, marsh excavation, and cofferdams.

Timing

complete by Nov 5, 2027. Work must start no later than March 1, 2027. Lighthouse Lane fully closed during the bridge replacement. No instream disturbance March 1 to July 20. Tree clearing only outside April 15 to October 31.

029Brillion-Reedsville, Brillion Ecpl-CTH WRehabilitates USH 10 between Brillion and Reedsville with milling, cold in-place recycling and about 22,000 tons of HMA, plus culvert replacements, guardrail and rumble strips, and mills and overlays Main Street in Reedsville.Manitowoc · NortheastResurfacingLarge118 items

Mills about 121,000 SY, recycles about 103,000 SY in place (CIR) and paves with about 22,000 tons of HMA under percent-within-limits testing. Includes about 11,000 CY of common excavation and grading (including a Long Lake Road section built in two stages and work at the CTH W intersection), culvert pipe and apron endwall replacements, MGS guardrail, edge and centerline rumble strips, curb ramps, and grooved wet-reflective epoxy marking. Traffic runs one lane under flagging with a pilot car during CIR, limited to 2 miles, with two-way traffic restored each night.

USH 10 · Reedsville · Manitowoc County · State ID 1500-68-71, 1500-75-71

Key items

HMA pavement 4 MT 58-28 Sabout 21,000TON
CIR asphaltic base layerabout 103,000SY
Removing asphaltic surface millingabout 121,000SY
Excavation commonabout 11,000CY
Marking line grooved wet ref epoxy 6-inchabout 106,000LF
Asphaltic rumble strips, edge and centerlineabout 72,000LF

Who should look

  • Asphalt / HMAHMA about 22,000 tons, CIR about 103,000 SY with about 480 tons stabilizing agent, milling about 121,000 SY, rumble strips
  • HaulingAbout 22,000 tons HMA and about 11,000 CY common excavation
  • EarthworkCommon excavation about 11,000 CY, ditch grading, culvert grading
  • Precast and pipeCulvert pipe (RCP class IV and non-metal) about 370 LF, 16 apron endwalls, storm sewer
  • GuardrailMGS guardrail about 375 LF and 4 EAT terminals
  • Signing and pavement markingGrooved wet reflective epoxy about 106,000 LF, no-passing zones about 4.9 mi, signs
  • Traffic controlDrums 3,000 days, barricades, PCMS, about 275,000 LF temporary paint
  • Erosion controlErosion mat about 12,000 SY, topsoil about 15,000 SY, silt fence about 5,500 LF, seeding
  • Ready-mix concreteCurb and gutter about 1,000 LF, sidewalk and curb ramps in Reedsville

Timing

55 working days. 2027 season; work must start no later than June 15, 2027. Milled or CIR surfaces open to traffic no more than 96 hours before paving.

030Appleton - Little Chute, Ballard Rd - Adams StMill and overlay of STH 96 with about 12,000 tons of HMA, plus concrete pavement patching, curb ramps, guardrail replacement, and epoxy marking.Outagamie · NortheastResurfacingMedium102 items

Milling of about 81,000 SY and about 12,000 tons of HMA, including cold weather paving. About 510 CY of high-early-strength concrete patching with drilled dowel and tie bars, curb and gutter, curb ramps, and inlet grate replacements. Steel plate beam guard and MGS guardrail replacement with terminals, and grooved wet-reflective epoxy lines with arrows and symbols. Traffic stays open on STH 96 with two 11-foot lanes, flagging allowed during work hours; work starts no earlier than June 1, 2027.

STH 96 · Appleton, Little Chute · Outagamie County · State ID 4620-02-71

Key items

Removing asphaltic surface millingabout 81,000SY
HMA Pavement 4 LT 58-28 Sabout 12,000TON
High-early-strength concrete pavement patchingabout 510CY
Drilled dowel barsabout 2,600EACH
Marking line grooved wet reflective epoxy 6-inchabout 61,000LF
Steel plate beam guard and MGS guardrailabout 1,200LF

Who should look

  • Asphalt / HMAAbout 12,000 tons of HMA pavement, PWL test strips, cold weather paving
  • HaulingAbout 81,000 SY of milling and about 12,000 tons of HMA
  • Ready-mix concreteAbout 510 CY of high-early-strength concrete patching, curb and gutter, sidewalk and curb ramps
  • GuardrailAbout 670 LF of steel plate beam guard and about 560 LF of MGS guardrail, 9 terminals
  • Signing and pavement markingAbout 61,000 LF of grooved wet-reflective epoxy, 177 arrows, 105 symbols, about 29,000 LF of line removal
  • Traffic control42-inch cones (about 70,000 days), drums (about 4,500 days), barricades, warning lights, PCMS, removable tape
  • Erosion control57 inlet protections, about 2,100 LF of silt fence, erosion mat and seeding

Timing

50 working days. Built within the 2027 season, start no earlier than June 1, 2027. Through traffic maintained on STH 96; single-lane flagging allowed during working hours.

031T Calumet, CTH W, Tribute - Pipe Creek Bridge P200925Replaces the CTH W crossing of a Pipe Creek tributary (P-20-0925) with a cast-in-place concrete culvert (V-20-0189), built half at a time under temporary signals.Fond du Lac · NortheastCulvert and drainageMedium70 items

Removes the existing structure P-20-0925 and builds concrete culvert V-20-0189 with about 180 CY of culvert concrete and about 20,000 LB of bar steel, using temporary shoring and a temporary 54-inch culvert pipe for water diversion. Roadway work includes common excavation, about 130 tons of asphalt surface (with cold weather paving), and epoxy marking. CTH W stays open with temporary traffic signals, temporary precast barrier and crash cushions, one half built at a time. No instream work March 1 - June 15.

CTH W · Town of Calumet · Fond du Lac County · State ID 4810-02-71

Key items

Concrete masonry culvertsabout 180CY
Bar steel reinforcement HS structuresabout 18,000LB
Temporary shoringabout 1,500SF
Excavation commonabout 600CY
Culvert pipe temporary 54-inchabout 160LF
Concrete barrier temporary precast installedabout 370LF

Who should look

  • Ready-mix concreteConcrete masonry culverts, about 180 CY
  • Rebar and structural steelBar steel reinforcement about 20,000 LB
  • Precast and pipeTemporary 54-inch culvert pipe about 160 LF; temporary precast barrier
  • Traffic controlDrums, barricades, warning lights, PCMS, removable tape, temporary signals
  • GuardrailTemporary crash cushions and temporary precast concrete barrier
  • Asphalt / HMAAsphaltic surface about 130 tons with cold weather paving
  • EarthworkCommon excavation about 600 CY, culvert excavation
  • Erosion controlErosion mat about 1,100 SY, silt fence, seeding
  • Signing and pavement markingEpoxy line about 1,500 LF plus cold weather epoxy
  • GeosyntheticsGeotextile types C and HR, about 660 SY

Timing

65 working days. 2027 season; work must start no later than July 6, 2027. CTH W stays open, half at a time under temporary signals. No instream work Mar 1 - Jun 15.

032T Ashford, Superior Drive, East Branch Rock River BridgeReplacement of the Superior Drive bridge over the East Branch Rock River in the Town of Ashford, with a new concrete bridge on steel piling and short asphalt approaches.Fond du Lac · NortheastBridgeMedium60 items

The contract removes old structure P-20-0907 and builds new bridge B-20-0270: about 170 CY of bridge concrete, about 25,000 LB of bar steel, and about 560 LF of steel HP 12-inch piling. Approach work is grading, about 140 tons of asphaltic surface, underdrain, and erosion control with topsoil, erosion mat, and turbidity barrier. Superior Drive is closed to through traffic with no posted detour. Work cannot start before July 6, 2027, and no instream work March 1 to June 15.

LOC STR · Town of Ashford · Fond du Lac County · State ID 4814-04-71

Key items

Concrete masonry bridgesabout 170CY
Bar steel reinforcement HS and HS coated structuresabout 25,000LB
Piling steel HP 12-inch x 53 lbabout 560LF
Asphaltic surfaceabout 140TON
Erosion mat urban Class I Type Babout 1,100SY
Geotextile Type DF and HRabout 570SY

Who should look

  • Ready-mix concreteAbout 170 CY of bridge concrete.
  • Rebar and structural steelAbout 25,000 LB of bar steel and about 560 LF of steel HP piling with pile points.
  • Asphalt / HMAAbout 140 tons of asphaltic surface and asphaltic flumes.
  • Erosion controlTopsoil, erosion mat, silt fence, turbidity barrier, and seeding.
  • Traffic controlType III barricades, warning lights, and signs for the road closure.
  • GeosyntheticsAbout 570 SY of Type DF and HR geotextile.

Timing

40 working days. Work cannot start before July 6, 2027; must start no later than August 2, 2027. Superior Drive closed to through traffic, no posted detour. No instream disturbance March 1 to June 15.

034CTH F - CTH E, Big Eau Pleine Rvr Bridge B-37-0481Replace the CTH P bridge over the Big Eau Pleine River with a new prestressed girder bridge on steel piling, plus approach paving, beam guard and erosion control.Marathon · North CentralBridgeMedium73 items

Remove existing structure B-37-0044 and build B-37-0481: about 489 CY of bridge concrete, about 800 LF of 45W prestressed girders, about 90,000 LB of bar steel, and steel HP piling with pre-boring and cofferdams. Approach work includes asphalt surface, MGS guardrail with thrie beam transitions, topsoil, erosion mat and seeding. CTH P is closed from Hillside Street to Beauville Lane with a detour on CTH P, CTH F, CTH N and CTH E; the detour cannot start until the Stratford school year ends. No instream work March 1 to June 15.

CTH P · Town of Eau Pleine · Marathon County · State ID 6652-01-70

Key items

Concrete masonry bridgesabout 480CY
Prestressed girder Type I 45W-inchabout 800LF
Bar steel reinforcement HS coated structuresabout 68,000LB
Piling steel HP 10-inch x 42 lbabout 870LF
Asphaltic surfaceabout 380TON
MGS guardrail 3 and thrie beam transitionabout 330LF

Who should look

  • Ready-mix concreteAbout 489 CY of bridge concrete plus 59 CY of seal concrete.
  • Rebar and structural steelAbout 90,000 LB of bar steel, 803 LF of prestressed girders, steel diaphragms and HP piling.
  • GuardrailMGS guardrail, thrie beam transitions and four EAT terminals.
  • Erosion controlAbout 2,400 SY of erosion mat, 1,315 LF of silt fence, turbidity barriers, topsoil and seeding.
  • Traffic controlType III barricades and warning lights for a full closure and detour.
  • Asphalt / HMAAbout 386 TON of asphaltic surface on the approaches.
  • Signing and pavement markingAbout 2,300 LF of 6-inch epoxy line and replacement signs.
  • GeosyntheticsAbout 870 SY of geotextile.

Timing

70 working days. Contract time 70 working days in the 2027 season; notice to proceed so work starts no later than July 14, 2027. CTH P closed with detour; detour not before the end of the 2026-27 Stratford school year. No instream work March 1 to June 15.

035Waupaca - Ogdensburg, S Br Little Wolf River Br B-68-0155Replaces the CTH E bridge over the South Branch Little Wolf River with a new prestressed girder bridge on steel piling, plus approach grading, asphalt paving and guardrail.Waupaca · North CentralBridgeMedium85 items

Removes existing structure B-68-0007 and builds new bridge B-68-0155 with 36W-inch prestressed girders, about 190 CY of bridge concrete and steel HP piling. Approach work includes common excavation, asphalt surface, centerline rumble strips, MGS guardrail and a driveway culvert. CTH E is closed with a signed detour via CTH B, STH 49, Elm St and Water St. No instream work March 1 to June 15; navigable-water buoys and boat traffic must be maintained.

CTH E · Town of Waupaca · Waupaca County · State ID 6844-01-72

Key items

Bar steel reinforcement HS coated structuresabout 26,000LB
Concrete masonry bridgesabout 190CY
Prestressed girder Type I 36W-inchabout 300LF
Piling steel HP 10-inch x 42 lbabout 520LF
Asphaltic surfaceabout 450TON
Excavation commonabout 1,100CY

Who should look

  • Ready-mix concreteAbout 190 CY of bridge concrete masonry for the new structure.
  • Rebar and structural steelAbout 30,000 LB of bar steel, prestressed girders, steel diaphragms and about 520 LF of steel HP piling.
  • Asphalt / HMAAbout 450 tons of asphaltic surface plus centerline rumble strips.
  • EarthworkAbout 1,100 CY of common excavation, grubbing and structure excavation.
  • GuardrailMGS guardrail, thrie beam transitions, EAT terminals and short-radius beam guard.
  • Precast and pipe15-inch corrugated steel culvert pipe with apron endwalls and pipe underdrain.
  • Traffic controlType III barricades and warning lights for the road closure and detour.
  • Erosion controlSilt fence, urban erosion mat, turbidity barriers, ditch checks, seeding.
  • GeosyntheticsGeotextile Type DF and HR, about 400 SY total.

Timing

60 working days. 2027 construction season; work must start by July 29, 2027. CTH E closed to through traffic with signed detour. No instream work March 1 to June 15.

036STH 29 - CTH D, Middle Br Embarrass Rvr Br B-58-140Replaces the CTH Q bridge over the Middle Branch Embarrass River with a new prestressed girder bridge (B-58-0140), with approach paving, guardrail and erosion control.Shawano · NortheastBridgeMedium77 items

Removes the existing structure B-58-0706 (with asbestos abatement and debris capture) and builds B-58-0140 on steel HP piling with 28-inch prestressed girders, about 240 CY of bridge concrete and about 33,000 LB of bar steel. Approach work includes common excavation, concrete approach slabs, asphalt surface, MGS guardrail with thrie beam transitions, and underdrain. CTH Q is closed to through traffic with a signed detour on STH 29, CTH J and CTH D. No instream work in the river from September 16 to April 30.

CTH Q · Shawano County · State ID 9394-00-70

Key items

Concrete masonry bridgesabout 240CY
Bar steel reinforcement HS coated structuresabout 25,000LB
Prestressed girder type I 28-inchabout 260LF
Piling steel HP 10-inch x 42 lbabout 400LF
Asphaltic surfaceabout 360TON
MGS thrie beam transitionabout 150LF

Who should look

  • Ready-mix concreteConcrete masonry bridges, about 240 CY, plus approach slabs
  • Rebar and structural steelAbout 33,000 LB bar steel, 28-inch prestressed girders, steel diaphragms, HP 10 steel piling
  • GuardrailMGS guardrail, thrie beam transitions, 4 EAT terminals
  • Asphalt / HMAAsphaltic surface, about 360 tons plus driveways
  • EarthworkCommon excavation about 650 CY, grubbing, structure excavation
  • Erosion controlErosion mat about 900 SY, silt fence, turbidity barriers, seeding
  • Traffic controlType III barricades, warning lights and signs for the closure and detour
  • GeosyntheticsGeotextile type HR about 570 SY

Timing

60 working days. 2027 season; work must start no later than July 9, 2027. CTH Q closed with detour. No instream work Sept 16 - Apr 30.

037Shawano - Langlade, STH 55 and CTH M (E) IntersectionRebuilds the STH 55 and CTH M (E) intersection in Menominee County with new grading, HMA pavement, curb and gutter, culvert pipes and permanent signing, built in stages under temporary signals.Menominee · NortheastReconstructionMedium76 items

Intersection rebuild with about 5,000 CY of common excavation, about 2,200 tons of HMA, about 590 LF of curb and gutter and elliptical concrete and steel culvert pipe. Traffic runs in three stages with temporary intersection signals and residential driveway temporary signals; surface paving is done under flagging after staging ends. The work is on Menominee tribal lands, with tribal permit, tree cutting and hiring-meeting requirements.

CTH M · Menominee County · State ID 9660-01-74

Key items

Excavation commonabout 5,000CY
HMA pavement 3 LT 58-28 Sabout 1,500TON
HMA pavement 4 LT 58-34 Sabout 750TON
Concrete curb & gutter 6-inch sloped 36-inch Type Dabout 590LF
Culvert pipe reinforced concrete horizontal elliptical HE-IV 19x30-inchabout 64LF
Topsoilabout 9,700SY

Who should look

  • EarthworkAbout 5,000 CY of common excavation plus embankment
  • Asphalt / HMAAbout 2,200 TON of HMA pavement in two mixes
  • HaulingExcavation and HMA tonnage
  • Precast and pipeElliptical reinforced concrete culvert pipe and endwalls, polymer coated steel culvert pipe
  • Ready-mix concreteAbout 590 LF of concrete curb and gutter
  • Traffic controlDrums (about 7,500 days), barricades, warning lights, temporary marking, temporary intersection and driveway signals
  • Erosion controlTopsoil and mulching (about 9,500 SY each), silt fence, seeding
  • Signing and pavement markingAbout 8,500 LF grooved epoxy line, new signs on wood posts

Timing

60 working days. 2027 construction season. Three traffic stages under temporary signals; upper asphalt layer placed under flagging after staging.

038Galesville - Whitehall, Beaver Creek to STH 95 WMill and repave USH 53 from Beaver Creek to STH 95 with about 62,000 tons of HMA, plus guardrail upgrades, bridge deck repair and culvert work.Trempealeau · NorthwestResurfacingLarge105 itemsWorth a look

Mill about 270,000 SY of asphalt and place about 62,000 tons of HMA with a material transfer vehicle, then add centerline and edge rumble strips and grooved wet-reflective epoxy marking. Upgrade beam guard with new MGS guardrail, EAT terminals and adjustments. Repair the deck on bridge B-61-47 under temporary signals, replace culvert pipe and endwalls, and clean and repair two box culverts. USH 53 stays open with single-lane flagging; the lower lift must be placed within 72 hours of milling.

USH 53 · Trempealeau County · State ID 1630-00-72

Key items

HMA pavement 4 MT 58-28 Sabout 62,000TON
Removing asphaltic surface millingabout 270,000SY
Tack coatabout 36,000GAL
Marking line grooved wet ref epoxy 6-inchabout 220,000LF
Asphaltic rumble strips, centerlineabout 62,000LF
MGS guardrail 3about 1,500LF

Who should look

  • Asphalt / HMAAbout 62,000 tons HMA, about 36,000 GAL tack coat, rumble strips
  • HaulingAbout 62,000 tons of HMA and about 270,000 SY of milling
  • GuardrailAbout 1,500 LF MGS guardrail, 30 EAT terminals, thrie beam transitions, about 5,500 LF beam guard adjusting
  • Signing and pavement markingAbout 220,000 LF grooved epoxy marking and no-passing zone locating
  • Traffic controlDrums, PCMS, warning lights and about 156,000 LF temporary marking
  • Precast and pipe24-inch RCP culvert pipe and endwalls, steel apron endwalls
  • Erosion controlAbout 9,300 LF silt fence, about 8,400 SY erosion mat, topsoil and seeding
  • ElectricalTemporary traffic signals at bridge B-61-47

Timing

60 working days. 2027 season. Open to traffic with single-lane flagging. Lower HMA lift within 72 hours of milling. Same-day centerline marking. No in-stream work in North Fork Beaver Creek September 15 to May 15.

039Black River Falls - Tomah, Coffee Creek Bridge B-27-0150Rehabilitation of the USH 12 bridge over Coffee Creek in Black River Falls, with new bridge concrete, coated rebar, curb and gutter, sidewalk, and approach paving.Jackson · NorthwestBridgeMedium81 items

The contract rehabilitates Structure B-27-0150 with about 270 CY of bridge concrete, about 45,000 LB of coated bar steel, adhesive anchors, and surface repair. Approach work replaces curb and gutter, sidewalk, approach slab, and a short run of asphalt. USH 12 stays open at all times using a temporary structure and temporary precast barrier, with pedestrian detour items. No instream work in Coffee Creek from September 15 to May 15.

USH 12 · Black River Falls · Jackson County · State ID 7185-00-70

Key items

Concrete masonry bridgesabout 270CY
Bar steel reinforcement HS coated structuresabout 45,000LB
Concrete sidewalk 4-inchabout 2,200SF
Concrete curb and gutter 30-inch Type Dabout 520LF
Concrete barrier temporary precast installedabout 1,200LF
Asphaltic surface (permanent and temporary)about 340TON

Who should look

  • Ready-mix concreteAbout 270 CY of bridge concrete plus curb and gutter, sidewalk, and driveway concrete.
  • Rebar and structural steelAbout 45,000 LB of coated bar steel and about 740 adhesive anchors.
  • Concrete paving and cementSmall quantities of 9-inch concrete pavement and approach slab (about 200 SY combined).
  • Asphalt / HMAAbout 200 tons of asphaltic surface plus about 140 tons of temporary surface.
  • Traffic controlDrums, Type III barricades, warning lights, PCMS, temporary precast barrier, and temporary crash cushions.
  • Signing and pavement markingSame-day epoxy line, marking removal, and moving existing signs.
  • Erosion controlSilt fence, urban erosion mat, inlet protection, topsoil, and seeding.

Timing

75 working days. 2027 construction season. USH 12 and side roads open at all times. No instream disturbance of Coffee Creek September 15 to May 15. Holiday work restrictions apply.

040C Arcadia, Main Street, CTH a to 250' W of STH 93Mills and repaves Main Street (STH 95) through Arcadia with about 9,400 tons of HMA, and replaces curb and gutter, sidewalk, storm sewer, sanitary sewer and water main along the corridor.Trempealeau · NorthwestResurfacingLarge148 itemsWorth a look

Urban mill and overlay of about 43,000 SY with new concrete curb and gutter (about 2,700 LF), about 12,000 SF of sidewalk and curb ramps, reinforced concrete storm sewer with new manholes and inlets, and city sanitary sewer and water main work (project 7720-00-81). Also removes railroad track, seals and repairs bridge B-61-0107, reinstalls street light poles, and places grooved epoxy pavement marking. STH 95 is detoured from no earlier than June 1, 2027 and must reopen to through traffic by August 4, 2027 (interim completion); mainline milling and paving does not start before August 9, 2027. Three side-street intersections may close for 10 working days each for utility work.

STH 95 · Arcadia · Trempealeau County · State ID 7720-00-71, 7720-00-81

Key items

HMA pavement 4 MT 58-34 Vabout 9,400TON
Removing asphaltic surface millingabout 43,000SY
Concrete sidewalk 5-inchabout 12,000SF
Concrete curb & gutter 30-inch type Dabout 2,400LF
Marking line grooved wet ref epoxy 6-inchabout 22,000LF
Storm sewer pipe reinforced concrete class IV 12-inchabout 500LF

Who should look

  • Asphalt / HMAHMA pavement about 9,400 tons, milling about 43,000 SY, patching, material transfer vehicle
  • HaulingAbout 9,400 tons HMA in, milled material and about 1,400 CY common excavation out, 580 tons contaminated soil disposal
  • Ready-mix concreteCurb and gutter about 2,700 LF, sidewalk about 12,000 SF, curb ramps, driveways, median nose
  • Precast and pipeRCP storm sewer about 700 LF, 11 manholes, 21 inlets, sanitary manholes
  • Traffic controlDrums about 10,000 days, Type III barricades, warning lights, temporary pedestrian routes and audible devices
  • Signing and pavement markingGrooved wet reflective epoxy about 22,000 LF, crosswalks, arrows, sign moves
  • ElectricalLight pole bases, lighting wire and conduit, salvage and reinstall 8 light poles
  • Erosion controlInlet protection (59), sod and topsoil
  • EarthworkCommon excavation about 1,400 CY, unsuitable material excavation, removals

Timing

complete by Sep 17, 2027. Interim completion: STH 95 reopened to through traffic by August 4, 2027. No STH 95 closure before June 1, 2027. Mainline milling/paving not before August 9, 2027. No instream work in the Trempealeau River Sept 15 - May 15.

041Wilson - Ecl, Wolf River Bridge B-18-0254Removes the CTH MM bridge over the Wolf River (B-18-0004) and builds a new prestressed girder bridge (B-18-0254) on steel piling, with approach grading, asphalt surface and new guardrail.Eau Claire · NorthwestBridgeMedium67 items

Bridge replacement on CTH MM: remove the old structure, including asbestos abatement, then build the new bridge with 54-inch prestressed girders, coated bar steel, tubular railing and steel HP piling with pre-boring into rock. Approach work covers excavation, asphalt surface, thrie beam transitions and four guardrail terminals. CTH MM is closed to through traffic during construction with no signed detour. No in-stream work March 15 to May 15; existing bridge may not be removed before May 17, 2027.

CTH MM · Eau Claire County · State ID 7820-08-70

Key items

Prestressed girder Type I 54W-inchabout 480LF
Concrete masonry bridgesabout 220CY
Bar steel reinforcement HS coated structuresabout 31,000LB
Piling steel HP 12-inch x 53 lbabout 320LF
Railing tubular Type Mabout 310LF
Asphaltic surfaceabout 360TON

Who should look

  • Ready-mix concreteAbout 220 CY of bridge concrete masonry
  • Rebar and structural steelAbout 35,000 LB of bar steel, steel HP piling, steel diaphragms and tubular railing
  • GuardrailThrie beam transitions (about 150 LF) and 4 guardrail terminals
  • Traffic controlType III barricades, warning lights and signs by the day for the road closure
  • Erosion controlSilt fence (about 1,300 LF), erosion mat (about 2,000 SY), turbidity barriers, seeding
  • GeosyntheticsGeotextile Type HR (about 790 SY) and Type DF

Timing

60 working days. Work to start no later than May 17, 2027; do not remove existing structure before May 17, 2027. CTH MM closed, no signed detour. No in-stream work March 15 to May 15.

042Siren - Spooner, West Co Ln to 1350 Ft W of 1st StResurfaces STH 70 from the west Washburn County line to near Spooner with a cold in-place recycled (CIR) asphalt layer and new HMA pavement, adds rumble strips, replaces culverts at Whiskey Creek and Dago Creek, and installs new guardrail.Washburn · NorthwestResurfacingLarge100 items

Rural resurfacing with about 126,000 SY of CIR asphalt layer, about 19,000 tons of HMA pavement and about 17,000 gallons of tack coat, plus edge and centerline rumble strips. Culvert work includes about 200 LF of 68x106-inch elliptical concrete culvert, 30-inch pipe, culvert liners and temporary diversion channels at both creeks. STH 70 stays open under flagging except for one full closure of up to 22 working days for the culvert work, with interim liquidated damages. New MGS guardrail and about 248,000 LF of epoxy line marking.

STH 70 · Spooner · Washburn County · State ID 8050-00-70

Key items

CIR asphaltic base layerabout 120,000SY
HMA pavement 5 MT 58-34 Sabout 19,000TON
Marking line epoxy 6-inchabout 150,000LF
Asphaltic rumble strips (edge)about 60,000LF
Culvert pipe reinforced concrete horizontal elliptical HE-III 68x106-inchabout 200LF
MGS guardrail 3 and 3 Kabout 770LF

Who should look

  • Asphalt / HMAAbout 19,000 TON of HMA pavement, CIR layer, asphalt stabilizing agent, tack coat
  • HaulingHMA tonnage plus about 1,800 CY of excavation
  • Precast and pipe68x106-inch elliptical concrete culvert, 30-inch pipe, temporary 72-inch culvert, culvert liners
  • GuardrailAbout 770 LF of MGS guardrail, 10 terminals, thrie beam transition
  • Signing and pavement markingAbout 158,000 LF epoxy line plus about 90,000 LF grooved epoxy
  • Traffic controlDrums, barricades, warning lights, PCMS, about 71,000 LF temporary paint marking
  • Erosion controlErosion mat (about 6,300 SY), silt fence (about 4,100 LF), salvaged topsoil, seeding
  • EarthworkAbout 1,800 CY of common excavation, ditch cleaning, diversion channels

Timing

55 working days. 2027 construction season. Flagging operations; one STH 70 closure with detour for culvert work, max 22 working days (interim liquidated damages). No in-stream work at Whiskey Creek March 1 to June 15 and Dago Creek September 15 to May 15.

043C Washburn, Bayfield Street, Washington Ave to Superior AveFull urban reconstruction of Bayfield Street (STH 13) through Washburn: new concrete and HMA pavement, curb and gutter, sidewalk, storm sewer, street lighting, and pavement marking.Bayfield · NorthwestReconstructionLarge160 itemsWorth a look

Existing concrete pavement (about 16,000 SY) and sidewalk are removed, about 37,000 CY of common excavation is dug, and the street is rebuilt with about 13,000 SY of 8-inch concrete pavement and about 6,800 tons of HMA. New work includes about 7,200 LF of concrete curb and gutter, about 63,000 SF of sidewalk, about 3,700 LF of reinforced concrete storm sewer with manholes and inlets, culverts, about 8,200 LF of underdrain, and 21 street lighting units. STH 13 is closed to through traffic with local and truck detours, work runs east to west, and business and pedestrian access is kept throughout.

STH 013 · Washburn · Bayfield County · State ID 8160-00-76

Key items

Excavation commonabout 37,000CY
Concrete pavement 8-inchabout 13,000SY
HMA pavement 3 MT and 4 MT 58-34 Sabout 6,800TON
Concrete sidewalk 4-inchabout 63,000SF
Concrete curb and gutter (Types A and D, sloped)about 7,200LF
Storm sewer pipe reinforced concrete 12- to 48-inchabout 3,700LF

Who should look

  • Concrete paving and cementAbout 13,000 SY of 8-inch concrete pavement with joint filling and dowel bars.
  • Ready-mix concreteAbout 7,200 LF curb and gutter, about 63,000 SF sidewalk, about 1,000 SY concrete driveways, curb ramps, steps.
  • Asphalt / HMAAbout 6,800 tons of HMA pavement with material transfer vehicle, plus driveway and patching asphalt.
  • HaulingAbout 37,000 CY of excavation, about 16,000 SY of concrete pavement removal, about 11,000 SY of milling, and about 6,800 tons of HMA.
  • EarthworkAbout 37,000 CY common excavation plus clearing and grubbing.
  • Precast and pipeAbout 3,700 LF reinforced concrete storm sewer, about 650 LF culvert pipe including elliptical, 14 manholes, about 40 inlets, about 8,200 LF underdrain.
  • Electrical21 street lighting units with foundations, about 2,700 LF conduit, and lighting wire.
  • Traffic controlDrums, Type III barricades, warning lights, PCMS, and temporary marking for detours and staging.
  • Signing and pavement markingAbout 66,000 LF 4-inch epoxy line, about 24,000 LF grooved wet-reflective epoxy, crosswalks, stop lines, sign moves.
  • Erosion controlAbout 12,000 SY topsoil and mulch, about 12,000 SY erosion mat, silt fence, inlet protection.

Timing

210 calendar days. Work in the 2027 season. STH 13 closed to through traffic: local detour on Washington Ave and Maki Road, truck detour on CTH C (8th Ave W). Reconstruct east to west; coordinate with the city's sanitary and watermain contractor and several utility relocations.

044Cornell - Ladysmith, Chippewa/Rusk Co Ln to USH 8Mill and overlay of STH 27 with about 56,000 tons of HMA, plus culvert replacements, bridge and box culvert repairs, a traffic signal replacement, and guardrail replacement.Rusk · NorthwestResurfacingLarge195 itemsWorth a look

Milling of about 247,000 SY and new HMA pavement (about 37,000 tons of 4 MT and about 18,000 tons of SMA) placed with a material transfer vehicle, with edge and centerline rumble strips. Culvert replacements with reinforced concrete round and elliptical pipe, wingwall and concrete surface repair on box culvert C-54-2335 at Meadow Brook, and repairs on bridge B-54-46 over Deer Tail Creek (galvanic anodes, pile cleaning and painting, railing post resealing). Traffic signal replacement at STH 27 and Port Arthur Road and MGS guardrail replacement. STH 27 closes for up to 14 days with a detour (STH 64, STH 40, USH 8) during a CN railroad crossing replacement in Ladysmith; otherwise single-lane flagging and temporary signals at the bridge and culvert.

STH 27 · Ladysmith · Rusk County · State ID 8180-00-81

Key items

Removing asphaltic surface millingabout 247,000SY
HMA Pavement 4 MT 58-34 Sabout 37,000TON
HMA Pavement 4 SMA 58-34 Vabout 18,000TON
Marking line grooved wet reflective epoxy 6-inchabout 184,000LF
Asphaltic rumble strips, edge and centerlineabout 150,000LF
Culvert pipe reinforced concrete (30-inch, 48-inch, and horizontal elliptical)about 920LF

Who should look

  • Asphalt / HMAAbout 56,000 tons of HMA including SMA, material transfer vehicle, PWL test strips
  • HaulingAbout 247,000 SY of milling and about 56,000 tons of HMA; about 5,800 CY of common excavation
  • Precast and pipeAbout 920 LF of reinforced concrete round and elliptical culvert pipe with about 30 concrete apron endwalls, storm sewer, inlet
  • Ready-mix concreteConcrete surface repair (about 740 SF) and concrete masonry on structures, about 530 LF of curb and gutter, sidewalk and curb ramps
  • Rebar and structural steelAbout 5,500 LB of bar steel reinforcement for structure repairs
  • GuardrailAbout 760 LF of MGS guardrail, about 290 LF of thrie beam transitions, 12 terminals, temporary crash cushions
  • ElectricalTraffic signal replacement at STH 27 and Port Arthur Road: poles, monotube arms, signal faces, cable, loop detectors; temporary signals at the bridge and culvert
  • Traffic controlDrums (about 2,800 days), barricades, PCMS (102 days), about 1,200 LF of temporary precast concrete barrier
  • Signing and pavement markingAbout 184,000 LF of grooved wet-reflective epoxy line plus arrows, crosswalks and railroad crossing markings
  • Erosion controlAbout 11,000 SY of erosion mat, about 5,300 LF of silt fence, 145 culvert pipe checks, seeding

Timing

65 working days. Built within the 2027 season. STH 27 full closure with detour for up to 14 consecutive days for the railroad crossing work. No in-stream work at Deer Tail Creek or Meadow Brook April 1 to June 1; tree clearing only before April 15.

045Webster - Hertel, STH 35 to Gaslyn RoadPulverize and relay of CTH X with about 14,900 tons of new HMA, plus new curb and gutter and storm sewer through the Webster urban section, new signs, and epoxy marking.Burnett · NorthwestResurfacingMedium80 items

Pulverize and relay of about 57,000 SY with about 14,900 tons of HMA paving, including cold weather paving. In the urban section from STH 35 to Perch Avenue: about 2,000 LF of new concrete curb and gutter, about 450 LF of 12-inch reinforced concrete storm sewer with manholes, and sidewalk at a curb ramp. Also new signs on wood posts, about 90,000 LF of 4-inch epoxy line, and about 11,000 LF of climbing turtle exclusion fence near the Yellow River wetlands. CTH X closes to through traffic with no signed detour; the urban section cannot start before June 1, 2027 and must reopen by August 31, 2027.

CTH X · Webster · Burnett County · State ID 8368-00-70

Key items

Pulverize and relayabout 57,000SY
HMA Pavement 3 LT 58-28 Sabout 8,400TON
HMA Pavement 4 LT 58-34 Sabout 6,500TON
Marking line epoxy 4-inchabout 90,000LF
Concrete curb and gutter 30-inch Type Dabout 2,000LF
Installing and maintaining climbing turtle exclusion fenceabout 11,000LF

Who should look

  • Asphalt / HMAAbout 14,900 tons of HMA pavement in two mixes, about 3,700 tons cold weather paving
  • HaulingAbout 14,900 tons of HMA and about 3,200 CY of common excavation
  • EarthworkAbout 3,200 CY of common excavation in the urban section and along the corridor
  • Ready-mix concreteAbout 2,000 LF of concrete curb and gutter, sidewalk and curb ramp
  • Precast and pipeAbout 450 LF of 12-inch reinforced concrete storm sewer, two 3-FT manholes, inlet work
  • Erosion controlAbout 11,000 LF of silt fence, about 12,000 SY of erosion mat, about 12,000 SY of topsoil and salvaged topsoil, seeding
  • Signing and pavement marking79 wood sign posts, about 360 SF of Type II signs, about 90,000 LF of epoxy line, no-passing zone layout
  • Traffic controlType III barricades (about 4,100 days), warning lights (about 6,900 days), drums

Timing

130 calendar days. Built within the 2027 season. No urban-section work (STH 35 to Perch Avenue) before June 1, 2027; interim completion to reopen that section by August 31, 2027. Turtle nesting restrictions near Yellow River wetlands March 4 to November 16 unless exclusion fence is in place.

046T Hoard, Bridge Road, Popple River Bridge B-10-0260Replace the Bridge Road crossing of the Popple River with a new concrete bridge B-10-0260 on steel piles, with a pier.Clark · NorthwestBridgeMedium59 items

Remove existing structure P-10-0073 and build B-10-0260 with about 260 CY of bridge concrete, about 38,000 LB of bar steel, HP 12-inch steel piling with pre-boring, and tubular railing. Includes approach grading, topsoil, erosion mat and seeding. Bridge Road is closed to through traffic with no signed detour. No in-stream work March 1 to June 15.

LOC STR · Town of Hoard · Clark County · State ID 8881-00-71

Key items

Concrete masonry bridgesabout 260CY
Bar steel reinforcement HS coated structuresabout 32,000LB
Piling steel HP 12-inch x 53 lbabout 540LF
Pre-boring rock or consolidated materialsabout 450LF
Railing tubular type Mabout 210LF
Geotextile type HRabout 850SY

Who should look

  • Ready-mix concreteAbout 260 CY of bridge concrete for B-10-0260
  • Rebar and structural steelAbout 38,000 LB of bar steel, structural steel and HP steel piling
  • Erosion controlSilt fence, erosion mat class II, mulching, turbidity barriers, seeding
  • Traffic controlType III barricades, warning lights and signs by the day
  • GeosyntheticsAbout 850 SY of geotextile type HR

Timing

55 working days. 2027 season. Road closed, no signed detour. No in-stream work March 1 to June 15.

047T Withee, Willow Road, S Fk Eau Claire River Br B-10-0269Replace the Willow Road crossing of the South Fork Eau Claire River with a new concrete bridge on steel piling, with tubular railing and erosion control.Clark · NorthwestBridgeMedium56 items

Remove existing structure P-10-0925 and build bridge B-10-0269: about 219 CY of bridge concrete, about 33,000 LB of bar steel, steel HP piling with pre-boring, cofferdams and tubular steel railing. Includes excavation and disposal of about 68 TON of creosote-contaminated soil, approach grading, erosion mat, turbidity barriers and seeding. Willow Road is closed during construction with no signed detour.

Local street (Willow Road) · Town of Withee · Clark County · State ID 8883-00-71

Key items

Concrete masonry bridgesabout 210CY
Bar steel reinforcement HS coated structuresabout 29,000LB
Piling steel HP 10-inch x 42 lbabout 330LF
Railing tubular Type Mabout 200LF
Excavation, hauling and disposal of creosote contaminated soilabout 68TON
Erosion mat Class II Type Cabout 310SY

Who should look

  • Ready-mix concreteAbout 219 CY of bridge concrete.
  • Rebar and structural steelAbout 33,000 LB of bar steel, structural steel, HP piling and tubular railing.
  • Erosion controlErosion mat, silt fence, turbidity barriers, ditch checks, mulch and seeding.
  • Traffic controlType III barricades and warning lights for the road closure.
  • GeosyntheticsAbout 400 SY of geotextile.

Timing

55 working days. Contract time 55 working days in the 2027 season. Willow Road closed, no signed detour.

048Stoughton - Madison, CTH B/Ab to Tower RoadReconstruct USH 51 between CTH B/AB and Tower Road with new concrete pavement, a roundabout at Mahoney Road, culverts, storm sewer, lighting and wildlife crossing culverts.Dane · SouthwestReconstructionMajor192 itemsWorth a look

Remove about 38,000 SY of concrete pavement, excavate about 73,000 CY, and pave about 45,000 SY of 8-inch concrete with about 4,700 TON of HMA. Builds the USH 51/Mahoney Road roundabout with lighting, about 9,000 LF of curb and gutter, storm sewer and inlets, about 1,100 LF of culvert pipe, terrestrial crossing culverts with animal barrier fence, guardrail, signing, grooved epoxy marking and landscape planting. USH 51 is closed to through traffic on a detour run under a separate contract; Phase 1 and Phase 2 may run together. The roundabout segment must reopen by July 1, 2027.

USH 51 · McFarland area · Dane County · State ID 5845-16-75

Key items

Concrete pavement 8-inchabout 45,000SY
Excavation commonabout 73,000CY
HMA pavement (4 LT and 4 MT)about 4,700TON
Concrete curb and gutter (all types)about 9,000LF
Culvert pipe, reinforced concrete and non-metal (all sizes)about 1,100LF
Geogrid Type SRabout 72,000SY

Who should look

  • Concrete paving and cementAbout 45,000 SY of 8-inch concrete pavement plus truck apron and colored concrete.
  • EarthworkAbout 73,000 CY of common excavation, plus rock and marsh excavation.
  • HaulingLarge excavation volume, about 38,000 SY of pavement removal, and HMA.
  • Asphalt / HMAAbout 4,700 TON of HMA pavement.
  • Ready-mix concreteAbout 9,000 LF of curb and gutter, about 14,000 SF of sidewalk, culvert concrete and median noses.
  • Precast and pipeAbout 1,100 LF of culvert pipe, about 1,000 LF of storm sewer, apron endwalls, inlets and a manhole.
  • Rebar and structural steelAbout 13,000 LB of bar steel for the culvert structures.
  • GuardrailAbout 1,000 LF of MGS guardrail, eight terminals and about 4,600 LF of animal barrier chain link fence.
  • ElectricalRoundabout lighting: 11 poles and LED luminaires, conduit, wire, pull boxes, control cabinet and service.
  • Traffic controlDrums, Type III barricades, warning lights and PCMS.
  • Signing and pavement markingAbout 52,000 LF of grooved wet-reflective epoxy line plus about 540 SF of new signs.
  • Erosion controlAbout 95,000 SY of erosion mat, about 97,000 SY of topsoil, silt fence, ditch checks and seeding.
  • Landscaping42 Mugo pine trees with planting care cycles.
  • GeosyntheticsAbout 72,000 SY of geogrid plus geotextiles.

Timing

complete by Sep 1, 2027. Interim completion July 1, 2027 to reopen the USH 51/Mahoney Road roundabout segment, Mahoney Road and Groundswell Way to two-way traffic. USH 51 through traffic detoured under project 5845-16-74. No instream work in Keenan's Creek March 1 to June 15; no tree clearing April 15 to October 31.

049Janesville - Big Foot, IH 43 to CTH KReconstructs USH 14 through Darien between IH 43 and CTH K with new concrete pavement, new storm sewer, curb and gutter and sidewalk, plus an asphalt mill and overlay on the south end.Walworth · SoutheastReconstructionMajor268 itemsWorth a look

Removes and replaces concrete pavement (about 41,000 SY of 9-inch concrete) with subgrade improvement and geogrid, and mills and overlays USH 14 from Sweet Rd to S&D Town Line Rd. Replaces storm sewer (about 7,600 LF of pipe, 46 manholes, about 70 inlets), about 12,000 LF of curb and gutter, sidewalk, curb ramps and driveways, and adds solar flashing beacons. Built in six stages; IH 43 ramps close and detour in Stage 2, and USH 14 closes to through traffic in Stages 3A-3C with a detour via CTH K, CTH X and IH 43. Stage 3A must reopen by August 27, 2027.

USH 014 · Village of Darien · Walworth County · State ID 3150-07-70

Key items

Concrete pavement 9-inchabout 41,000SY
Excavation commonabout 50,000CY
HMA pavement (3 MT and 4 MT)about 8,600TON
Storm sewer pipe, reinforced concrete and Class III-A, 12- to 72-inchabout 7,600LF
Concrete curb and gutterabout 12,000LF
Geogrid Type SRabout 47,000SY

Who should look

  • Concrete paving and cementAbout 41,000 SY of 9-inch concrete pavement, about 1,900 SY variable-depth concrete pavement, joint filling and tie bars.
  • Ready-mix concreteAbout 12,000 LF of curb and gutter, about 24,000 SF of sidewalk, concrete driveways, Type S32 barrier, joint repair.
  • Asphalt / HMAAbout 8,600 tons of HMA pavement, about 1,400 tons of asphaltic repair, asphaltic patching, rumble strips.
  • EarthworkAbout 50,000 CY of common excavation, large pavement removals (about 51,000 SY asphalt, 29,000 SY concrete), milling.
  • HaulingAbout 50,000 CY of excavation, pavement removals and about 10,000 tons of asphalt to move.
  • Precast and pipeAbout 7,600 LF of storm sewer pipe, elliptical and steel culvert pipe, 46 manholes, about 70 inlets and catch basins, about 14,700 LF of pipe underdrain.
  • Traffic controlDrums, Type III barricades, tubular marker posts, arrow boards, PCMS and temporary marking for six stages and detours.
  • Signing and pavement markingAbout 1,700 SF of Type II signs on about 200 posts; about 30,000 LF of grooved wet-reflective epoxy and about 38,000 LF of cold-weather epoxy marking.
  • GeosyntheticsAbout 47,000 SY of geogrid and about 8,400 SY of geotextile.
  • Erosion controlAbout 30,000 SY topsoil, about 46,000 SY mulching, about 30,000 SY erosion mat, inlet protection, seeding.
  • GuardrailSteel thrie beam and bullnose terminals, about 730 LF of safety fence, concrete barrier.
  • ElectricalSolar flashing beacon systems at CTH X and near the fire station, and relocated RRFB systems at Madison St.

Timing

complete by Nov 5, 2027. Six-stage build in 2027. Stage 3A cannot start before May 28, 2027 and must reopen USH 14 by August 27, 2027 (interim liquidated damages). IH 43 ramp closures in Stages 2A-2B; USH 14 closed to through traffic in Stages 3A-3C. Darien Cornfest September 3-17, 2027 limits one pedestrian route option.

050T Frankfort, Huckleberry Road, Randall Creek Bridge, B-37-0498Replacement of the Huckleberry Road crossing of Randall Creek with a new concrete bridge on steel H-piles, with tubular railing and a short asphalt approach.Marathon · North CentralBridgeMedium60 items

Old structure P-37-0270 is removed and new bridge B-37-0498 is built inside cofferdams on steel HP 10-inch piling, with about 240 CY of bridge concrete, about 36,000 LB of reinforcing bar, and about 220 LF of Type M tubular railing. Approaches get about 70 tons of asphaltic surface and new signs. Huckleberry Road is closed with no posted detour; in-stream work is barred March 1 to June 15, and turtle exclusion fence and nesting-season limits apply near the creek.

LOC STR · Town of Frankfort · Marathon County · State ID 6671-01-70

Key items

Concrete masonry bridgesabout 240CY
Bar steel reinforcement HS coated structuresabout 31,000LB
Piling steel HP 10-inch x 42 lbabout 320LF
Railing tubular Type Mabout 220LF
Climbing turtle exclusion fenceabout 450LF
Asphaltic surfaceabout 70TON

Who should look

  • Ready-mix concreteAbout 240 CY of bridge concrete.
  • Rebar and structural steelAbout 31,000 LB coated and about 5,400 LB uncoated reinforcing bar, about 320 LF steel HP piling, about 220 LF tubular steel railing.
  • Erosion controlSilt fence, urban erosion mat, turbidity barriers, seeding.
  • Traffic controlType III barricades, warning lights, and signs for the road closure.
  • GeosyntheticsAbout 300 SY Type HR and about 52 SY DF geotextile.
  • Asphalt / HMASmall: about 70 tons of asphaltic surface.
  • Signing and pavement markingSmall: about 12 SF of new signs on wood posts, ROW markers.

Timing

50 working days. Work in the 2027 season; notice to proceed so work starts no later than August 15, 2027. No in-stream disturbance March 1 to June 15. Turtle exclusion fence and nesting-season (May 20 to September 18) limits within 200 ft of the creek. Road closed, no detour.

051T Wien, Chesak Road, Scotch Creek Bridge, B-37-0499Replaces the Chesak Road crossing of Scotch Creek with a new concrete bridge on steel piling, with short asphalt approaches.Marathon · North CentralBridgeMedium59 items

Removes existing structure P-37-0957 and builds new bridge B-37-0499 with about 230 CY of concrete, coated bar steel, steel HP piling with pre-boring, and a cofferdam. Approach work is light: about 100 tons of asphaltic surface and small excavation. Chesak Road is closed for the project with no posted detour. No instream work March 1 to June 15.

LOC STR · Town of Wien · Marathon County · State ID 6672-01-70

Key items

Concrete masonry bridgesabout 230CY
Bar steel reinforcement HS coated structuresabout 25,000LB
Piling steel HP 10-inch x 42 lbabout 290LF
Pre-boring rock or consolidated materialsabout 210LF
Asphaltic surfaceabout 100TON
Erosion mat urban Class I Type Babout 630SY

Who should look

  • Ready-mix concreteAbout 230 CY of bridge concrete masonry.
  • Rebar and structural steelAbout 30,000 LB of bar steel and about 290 LF of steel HP piling.
  • Asphalt / HMAAbout 100 tons of asphaltic surface and asphaltic flumes.
  • Traffic controlType III barricades and warning lights for the road closure.
  • Erosion controlSilt fence, urban erosion mat, turbidity barriers, seeding.
  • GeosyntheticsGeotextile Type DF and HR, about 430 SY total.

Timing

40 working days. 2027 construction season. Chesak Road closed for the duration, no posted detour. No instream work March 1 to June 15.

Want only the proposals that fit your business?

When a letting posts in a state we cover, LeadSifter reads it and emails you the projects that call for your products. Ask for a sample report built for what you sell.

Letting December 8, 2026, as advertised when LeadSifter first saw it on November 4, 2026. Addenda posted after that date are not reflected. Check the WisDOT letting page before you bid.

Built from the DOT's own proposal PDFs (schedule of items, special provisions). Quantities are rounded down and units are as published. No prices, estimates or bidders are shown. Regions are WisDOT's five regions, assigned by county. Proposal 017 is a Southeast region-wide marking contract and is counted in each county it names.